Inspection History Details
Inspection Status: Approved
Inspection History: ROOF NAILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/08/2019 | ROOF NAILING | Approved | ||
| 08/06/2008 | ROOF NAILING | Partial Approval | ||
| 07/31/2008 | ROOF NAILING | Not ready for Inspection | IVRS - Inspection :* 1. STILL NEED STAMPED OSB VS PLYWOOD 2. NEED CLARIFICATION FOR RED LINED DETAIL (201) - S4 |
|
| 07/28/2008 | ROOF NAILING | Not ready for Inspection | IVRS - Inspection :* 1. CALLS FOR H3 AT EVERY JOIST USED H2.5 BEND OVER 2. USED 5/8 OSB INSTEAD OF PLYWOOD 3. NEEDS TO UNCOVER BOXED IN OVERHANG IN A SPOT 4. DRY IN AT OWN RISK |