Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/29/2008 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 09/26/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : There is no access to the site.| 920* BLD. LOCKED |
|
| 09/23/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. BOND BUSHINGS REQUIRED PER PLAN NOTES 2. BOND INTERIOR PIPING PER PLAN 3. NEW CONDUITS TO BE RIGID STEEL PER NOTES |
|
| 09/15/2008 | ELECTRIC - FINAL | Cancelled | CANCELLED PER TOM OF K.A.Z. CONST. #631-0281 | |
| 09/15/2008 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* CANCELED BY CONTRACTOR |
|
| 09/10/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* INSTALL PER PLAN OR PROVIDE APPROVED REVISION |
|
| 08/07/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) HAVE #10 AWG ON 40 AMP BREAKER. PLAN CALLS FOR CONDUCTORS TO BE #4 AWG, CANNOT HAVE #10 WIRE ON 40 AMP BREAKER MAX TO BE 30 AMP |