Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/26/2008 | ELECTRIC - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 09/23/2008 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection : A reinspection fee has been assessed for this inspection. Multiple inspectio |
|
| 09/15/2008 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. BLD. STEEL TO BE BONDED TO GROUNDING ELECTRODE SYSTEM NOT #12 BRANCH CIRCUIT GROUNDS 2. NEUTRAL TO TIE WITH NEUTRALS ONL 3. REINSP. FEE NEXT INSPECTION IF NO COMPLIANCE 4. SEE NOTES FROM PREVIOUS INSPECTIONS 5. READ NOTES ON ELECTRICAL PLAN...SPECS... 6. ALL CONDUCTORS TO BE STRANDED RSC IN EXPOSED AREA |
|
| 09/12/2008 | ELECTRIC - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 09/11/2008 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. BOND METAL BLD. STRUCTURE PER NEC 250.104 3 C WATER PER 250.104 2. VERIFY UTILITY ROOM LIGHT TO BE CONTROLLED THRU TIME CLOCK 3. INSTALL BOND BUSHINGS AS PER PLAN NOTE #10.0 SHEET E1.2 4. GROUND CONNECTIONS LOOSE IN DISCONNECT |
|
| 09/10/2008 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. COULD NOT LOCATE PERSONNEL ON SITE 2. NO ADDRESS (325) POSTED |
|
| 08/07/2008 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1) BOX OVER FILLED 2) PANEL "A" NOT INSTALLED PER PLANS-CALLS FOR 2-110V, 1-GROUND AND1-GROUNDING CONDUCTOR FROM EXISTING 3) ONLY ONE CONDUCTOR PER TERMINAL LUG 4) LUG TO HAVE SURFACE CONTACT 5) NEED ELECTRICIAN PRESENT TO SHOW WHERE 1ST SERVICE IS |
|
| 07/03/2008 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* WILL NEED TO INSTALL GROUNDING ELECTRODE SYSTEM SEE PLANS & NEC 250 WILL CHECK @ FINAL |