Inspection History Details
Inspection Status: Approved
Inspection History: ROOF NAILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/19/2008 | ROOF NAILING | Approved | IVRS - Inspection :* | |
| 06/25/2008 | ROOF NAILING | Partial Approval | IVRS - Inspection :* 1) OK TO COVER ROOF/NAILING OK 2) NEED ADDRESS ON PANEL 3) NEED TO REMOVE EXTENSION CHORDS FROM SHED (FIRE HAZARD) 4) NEED TO BOND GAS LINE WITH APPROVED METHODS 5) NEED TO SHOW EXACT LAYOUT OF BLDG (INTERIOR) 6) NEED STAMPED APPROVED DRAWINGS ON STIE BY CITY 7) NEED SUPPORT ON MAST SERVICE LATERALS OVER 50 FT |
|
| 05/30/2008 | ROOF NAILING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) GROUND ELECTRIC J-BOX 2) LOOSE SHEATHING ON ROOF 3) APPEARS ROOF FRAMING WAS REPLACED 4) S.E. CORNER OF HOUSE, ADOBE WALL WAS REPLACED 5) INTERIOR REMODEL BEING DONE 6) GET PERMITS FOR ALL NEW CONSTRUCTION AND PROVIDE ACCESS TO INTERIOR OF UNIT |