Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/21/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* CORRECTIONS MADE OK PLUMBING FINAL OK |
|
| 03/19/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* CONTRACTOR TO PAY REFEE FOR FAILURE TO COMPLY WITH NOTES LEFT ON 3/13/08 AND 3/18/08 PRIOR TO HAVING FINAL PLUMBING INSPECTION |
|
| 03/18/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* USE APPROVED MEANS TO SUPPORT & SECURE EXPANSION TANK AT WATER HEATER |
|
| 03/13/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. WATER HEATER EXPANSION TANK REQUIRES SUPPORT AND SECURE 2. PROVIDE FULL SIZE RIDGID PIPING FOR TEMPERATURE AND PRESSURE RELIEF DRAIN PIPING (NO FLEX) 3. MAKE LAUNDRY TUB WATER TIGHT AT WALL 4. INSULATE MINIMUM 8' IN & 8' OUT OF WATER HEATER TO MEET 2006 ENERGY CONSERVATION CODE 5. PUBLIC USE LAVS REQUIRE A MEANS BESIDES THE WATER HEATER TO LIMIT HOT WATER TEMPERATURE TO 110 DEG. SEE NOTE #14 |