Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T07CM04371
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/18/2008 | ENGINEERING - FINAL | Approved | Approved for C of O. | |
03/03/2008 | ENGINEERING - FINAL | Partial Approval | OK FOR TEMP C OF O THERE AR 3 PHASES OF CONSTRUCTION = 3 PERMITS. 1. CLEAN UP CONSTRUCTION MATERIAL AND DEBRIS INCLUDING PAINT AND CONCRETE WASHOUT. 2. CONSOLIDATE CONSTRUCTION STORAGE AREA. 3. PROVIDE SAFE PUBLIC PEDESTRIAN AND VEHICLE ACCESS. 4. BARRICADE CONSTRUCTION AREAS TO PREVENT PUBLIC ACCESS. |