Permit: T07CM04371

Parcel: 11011181B

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
04/18/2008 ENGINEERING - FINAL Approved Approved for C of O.
03/03/2008 ENGINEERING - FINAL Partial Approval OK FOR TEMP C OF O
THERE AR 3 PHASES OF CONSTRUCTION = 3 PERMITS.
1. CLEAN UP CONSTRUCTION MATERIAL AND DEBRIS INCLUDING PAINT AND CONCRETE WASHOUT.
2. CONSOLIDATE CONSTRUCTION STORAGE AREA.
3. PROVIDE SAFE PUBLIC PEDESTRIAN AND VEHICLE ACCESS.
4. BARRICADE CONSTRUCTION AREAS TO PREVENT PUBLIC ACCESS.