Permit: T07CM04371

Parcel: 11011181B

Inspection Status: Approved

Inspection History: MECHANICAL - ABOVE CEILING

Permit Number - T07CM04371

Inspection Description - MECHANICAL - ABOVE CEILING

Inspection Status - Approved

Date Description Inspector Results Comments
04/18/2008 MECHANICAL - ABOVE CEILING Approved IVRS - Inspection :*
04/17/2008 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection :*
OK TO CLOSE BOTTOM OF EXHAUST DUCTS
FIRE WRAP PROGRESSING
04/15/2008 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection :*
CHECKED REMAINING WELDS ON GREASE DUCTS
OK TO FIRE WRAP 1ST LAYER
ACCESS DOORS - OK TO PROCEED
03/24/2008 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection :*
OK CEILING TILES ICE ROOM, SEWING ROOM, LOCKER ROOM
03/20/2008 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection :*
- SEE ENGINEER FOR RETURN OR TRANSFER AIR TO
LOCKER ROOM AC
- OK FOR CEILING TILES COLD STORAGE ROOM
03/18/2008 MECHANICAL - ABOVE CEILING Not ready for Inspection IVRS - Inspection :*
03/14/2008 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection :*
CHECKED 1ST GREASE DUCT IN SHAFT OK TO PROCEED WITH 2ND DUCT. OK TO COVER HARD LID IN DINING ROOM.
02/20/2008 MECHANICAL - ABOVE CEILING Partial Approval OK CEILING TILES 123, 124, 125, 133, 134, CORRIDOR 122
NEED RA TRANSFER ROOM 134
02/15/2008 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection :*
TESTED DUCT SMOKE DETECTORS 218-222, 223, 224, 217, 216, 215, 214, 213, 212, 211, 210, 209, 208, 207,
CORRIDORS 206 & 201

SEE BLDG INSP. FOR TEMP C OF O
02/13/2008 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection :*
02/06/2008 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection :*
1ST FLOOR SOUTH CORRIDOR OK FOR CEILING TILES
01/31/2008 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection :*
FIRE-RATED SHAFT REQUIRED FOR PENETRATION OF FIRE RATED FLOOR/CEILING ALL THE WAY THROUGH THE ROOF & MUST BE EQUAL TO EXISTING FIRE RATING.
NOT NECESSARY TO FIRE WRAP GREASE DUCTS IN A FIRE RATED SHAFT. REVISE PLANS AS NEEDED. NEED TO TEST DUCT SMOKE DETECTORS SYSTEM IN SOUTH SIDE PHASE 1
01/28/2008 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection :*
SUSPENDED ROUGH DUCT
OK TO PROCEED
PROVIDE MIN. 20X30 ACCESS DOORS TO SERVICE FAN COILS ABOVE RESTROOMS