Permit: T07CM04318

Parcel: 135074560


Addresses:

1800 S RESEARCH LP


Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Permit Number - T07CM04318

Inspection Description - EXCAVATION/LAYOUT REBAR & ZON

Inspection Status - Approved

Date Description Inspector Results Comments
12/17/2008 EXCAVATION/LAYOUT REBAR & ZON Approved
11/20/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval STEEL REINFORCEMENT @ CONCRETE SOUTH TRUCK DOCK WALLS
05/28/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1. DOCK RAMP FLOOR REINFORCEMENT STEEL W/SUMP
2. TWO FRONT CANOPY STEEL COLUMN CONCRETE BASES OK
05/21/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
SOUTH END SITE RETAINING WALL FOOTING REINFORCEMENT STEEL -- OK TO POUR
05/16/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
BALANCE OF CLOSURE POUR COMPLETE - BALANCE OF DRY PACK AT STEEL COLUMNS EXCEPT BRIDGE CRANE COLUMNS AND WEST SIDE LOADING DOCK WALL STEEL REINFORCEMENT
05/12/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
WEST SIDE DOCK WALL FOOTINGS F-8 & F-9 AND CANOPY SPREAD FOOTINGS @ N/W EXTERIOR -- OK
05/05/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
POUR BACK SLAB SOUTH 1/2
04/22/2008 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
04/21/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
STEEL REINFORCEMENT IN TILT-UP @ STAIRWELL EXTERIOR SUPPORT WALL @ GRID LINE #11.2 AND THE FOOTINGS FOR CONNECTING CMU STORAGE ROOM #149
04/14/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
REINFORCEMENT STEEL @ TILT UP WALL PANELS FOR PANELS #36, #37, #38, #39, #40, #41 AND #42 W/IMBEDS
04/10/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
REINFORCEMENT STEEL @ 2 TILT UP WALL PANELS @ GRID
"A" PANEL #1 AND #10 SPECIAL INSPECTOR HAS REVIEWED AND ACCEPTED
04/09/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
REINFORCEMENT STEEL @ 8 TILT UP WALL PANELS @ GRID LINE "A"
PANELS #2 THRU 9 OK

SPECIAL INSPECTOR HAS REVIEWED AND ACCEPTED
03/26/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
CONTINUOUS WALL FOOTINGS @ GRID LINES
6 TO 14/A TO E
7 TO 13/ E & 5 - F12 & 2 - F5
SPREAD FOOTINGS
03/20/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
7 - TILT UP WALL PANELS #29 THRU #35 ON THE SOUTH HALF OF THE EAST EDGE OF BUILDING
SPECIAL INSPECTOR PATTISON EVANOFF (CARL) REVIEWED AND ACCEPTED
03/17/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
TILT UP WALL PANELS #21 THRU #28 AS PER PLANS & SPECS
SPECIAL INSPECTION COMPLETED
03/13/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1. ELEVATOR PIT FLOOR & SUMP
2. 11 TILT UP PANELS - #11 THRU #20
03/03/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
SPREAD FOOTINGS @ GRID LINES 6/B & C, 7/B.2 - 7.2/B.5
8/B & C & D - 9/B, C & D - 10/B, C & D, 11/B, C & D, 12/B, C & D,
10.7/B & C AND 13/B & C
02/28/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
CONTINUOUS FOOTING @ EXTERIOR WALLS AT
GRID LINES E/1 TO 6 --- 1/E TO A --- A/1 TO 6
ALL F9 FOOTING OK
02/13/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
REINFORCEMENT STEEL AT
GRADE BEAM @ GRID LINES 6/A TO E
W/ANCHOR BOLTS
02/08/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
12 - "F-1" COLUMN FOOTINGS AS PER DETAILS 103 & FOOTING SCHEDULE ON S1.3 @ GRID B, C AND D/2, 3, 4 & 5 --
OK TO POUR
02/04/2008 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
1) CONTRACTOR CANCELLED-RAINED OUT