Inspection History: EXCAVATION/LAYOUT REBAR & ZON
Permit Number - T07CM04318
Inspection Description - EXCAVATION/LAYOUT REBAR & ZON
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/17/2008 | EXCAVATION/LAYOUT REBAR & ZON | Approved | ||
11/20/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | STEEL REINFORCEMENT @ CONCRETE SOUTH TRUCK DOCK WALLS | |
05/28/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1. DOCK RAMP FLOOR REINFORCEMENT STEEL W/SUMP 2. TWO FRONT CANOPY STEEL COLUMN CONCRETE BASES OK |
|
05/21/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* SOUTH END SITE RETAINING WALL FOOTING REINFORCEMENT STEEL -- OK TO POUR |
|
05/16/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* BALANCE OF CLOSURE POUR COMPLETE - BALANCE OF DRY PACK AT STEEL COLUMNS EXCEPT BRIDGE CRANE COLUMNS AND WEST SIDE LOADING DOCK WALL STEEL REINFORCEMENT |
|
05/12/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* WEST SIDE DOCK WALL FOOTINGS F-8 & F-9 AND CANOPY SPREAD FOOTINGS @ N/W EXTERIOR -- OK |
|
05/05/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* POUR BACK SLAB SOUTH 1/2 |
|
04/22/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
04/21/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* STEEL REINFORCEMENT IN TILT-UP @ STAIRWELL EXTERIOR SUPPORT WALL @ GRID LINE #11.2 AND THE FOOTINGS FOR CONNECTING CMU STORAGE ROOM #149 |
|
04/14/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* REINFORCEMENT STEEL @ TILT UP WALL PANELS FOR PANELS #36, #37, #38, #39, #40, #41 AND #42 W/IMBEDS |
|
04/10/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* REINFORCEMENT STEEL @ 2 TILT UP WALL PANELS @ GRID "A" PANEL #1 AND #10 SPECIAL INSPECTOR HAS REVIEWED AND ACCEPTED |
|
04/09/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* REINFORCEMENT STEEL @ 8 TILT UP WALL PANELS @ GRID LINE "A" PANELS #2 THRU 9 OK SPECIAL INSPECTOR HAS REVIEWED AND ACCEPTED |
|
03/26/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* CONTINUOUS WALL FOOTINGS @ GRID LINES 6 TO 14/A TO E 7 TO 13/ E & 5 - F12 & 2 - F5 SPREAD FOOTINGS |
|
03/20/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 7 - TILT UP WALL PANELS #29 THRU #35 ON THE SOUTH HALF OF THE EAST EDGE OF BUILDING SPECIAL INSPECTOR PATTISON EVANOFF (CARL) REVIEWED AND ACCEPTED |
|
03/17/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* TILT UP WALL PANELS #21 THRU #28 AS PER PLANS & SPECS SPECIAL INSPECTION COMPLETED |
|
03/13/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1. ELEVATOR PIT FLOOR & SUMP 2. 11 TILT UP PANELS - #11 THRU #20 |
|
03/03/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* SPREAD FOOTINGS @ GRID LINES 6/B & C, 7/B.2 - 7.2/B.5 8/B & C & D - 9/B, C & D - 10/B, C & D, 11/B, C & D, 12/B, C & D, 10.7/B & C AND 13/B & C |
|
02/28/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* CONTINUOUS FOOTING @ EXTERIOR WALLS AT GRID LINES E/1 TO 6 --- 1/E TO A --- A/1 TO 6 ALL F9 FOOTING OK |
|
02/13/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* REINFORCEMENT STEEL AT GRADE BEAM @ GRID LINES 6/A TO E W/ANCHOR BOLTS |
|
02/08/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 12 - "F-1" COLUMN FOOTINGS AS PER DETAILS 103 & FOOTING SCHEDULE ON S1.3 @ GRID B, C AND D/2, 3, 4 & 5 -- OK TO POUR |
|
02/04/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* 1) CONTRACTOR CANCELLED-RAINED OUT |