Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T07CM04228
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/06/2008 | ENGINEERING - FINAL | Approved | TRAILER GONE | |
07/10/2008 | ENGINEERING - FINAL | Partial Approval | PARTIAL -THE ONLY OUTSTANDING ISSUE IS THE JOB SITE TRAILER NO CONCERNS FOR BUSINESS TO BE OPEN ADA PARKING ADDRESSED AND IS WITHIN 2% |
|
07/09/2008 | ENGINEERING - FINAL | Not ready for Inspection | ASPHALT IN H/C RAMP AND PARKING AREA BEING REMOVED | |
07/09/2008 | ENGINEERING - FINAL | Not ready for Inspection | ASPHALT REMOVED AND BEING REPLACED | |
07/08/2008 | ENGINEERING - FINAL | Not ready for Inspection | MET WITH ERIC AND ASPHALT CONTRACTOR TO DISCUSS DRAINAGE AND H/C PARKING POSSIBLE FIXES | |
07/03/2008 | ENGINEERING - FINAL | Not ready for Inspection | ADDRESS ADA PARKING ISSUES INCLUDING THE DIFFERENCE BETWEEN RAMP AND ASPHALT, SLOPE ON PARKING STALL AND STANDING WATER AT THE RAMP ENTRANCE | |
06/24/2008 | ENGINEERING - FINAL | Partial Approval | SUB GRADE BEING PREP FOR PAVING | |
06/20/2008 | ENGINEERING - FINAL | Partial Approval | SITE VISIT TO CLARIFY ADA ROUTE RAMP SLOPES | |
05/28/2008 | ENGINEERING - FINAL | Partial Approval | MET WITH NEW SITE SUPER LOOKED AT SITE PLAN-DISCUSSED HARDSCAPE AND REQ'MTS FOR C OF O |
|
04/18/2008 | ENGINEERING - FINAL | Denied | Complete all work before calling in for final inspection. |