Inspection Status: Approved
Inspection History: MECHANICAL - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/23/2008 | MECHANICAL - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 07/03/2008 | MECHANICAL - INTERMEDIATE | Partial Approval | IVRS - Inspection :* THE INTENT OF THE FLEX DUCT DETAIL ON PLANS IS TO SEAL THE DUCT AND THE VAPOR BARRIER. PUTTING TAPE 3" AWAY FROM THE EDGE OF THE VAPOR BARRIER DOES NOTHING. TAPE GOES ON THE EDGE OF THE VAPOR BARRIER, THEN THE STRAP. WILL CHECK AFTER DIFFUSERS ARE INSTALLED IN GRID CEILING. |
|
| 06/18/2008 | MECHANICAL - INTERMEDIATE | Denied | IVRS - Inspection : A reinspection fee has been assessed for this inspection. Multiple inspectio CORRECTIONS NOT MADE THIS INSPECTION HAS BEEN RE-FEE'D |
|
| 06/13/2008 | MECHANICAL - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* |