Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/13/2007 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* CORRECTIONS HAVE BEEN MADE |
|
| 11/21/2007 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* PROVIDE PROPER DESCRIPTION OF WORK & ANY NECESSARY DRAWINGS APPROVED BY THE CITY OF TUCSON. A ROOFTOP FURNACE WAS NOT REPLACED. HIGH VOLTAGE WIRE NOT PROPERLY CONNECTED TO LUG INSIDE ELEC. DISCONNECT CONDENSATE CANNOT TERMINATE INTO A SEWER VENT. PROVIDE A GFI RECEPTACLE ON ROOF WITH A WATERPROOF BOX & BUBBLE TYPE COVER. 1/2" GAS PIPE 70' FROM METER NOT ADEQUATE FOR 96,000 BTU FURNACE. EXTEND 3/4" PIPE UP TO THE FURNACE. |
|
| 11/06/2007 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |