Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T07CM04127


Addresses:

8940 E RITA PARK DR

Inspection Status: Approved

Inspection History: REINFORCED MASONRY PRE-GROUT

Date Description Inspector Results Comments
12/16/2008 REINFORCED MASONRY PRE-GROUT Approved IVRS - Inspection :*
06/24/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
TOP OUT @ INTERIOR CMU WALLS IN PUMP HOUSE
06/23/2008 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
06/20/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
TOP OUT OF CMU INTERIOR WALLS @ TRUCKERS BREAKROOM
06/19/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. 3RD LIFT/TOP OUT @ TRUCKER BREAKROOM CMU WALLS
2. 2ND LIFT TO 8 FT @ INTERIOR PARTITION PUMP HOUSE CMU WALLS
06/18/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. 8' IN PUMP HOUSE - VERTS MISSING EACH SIDE OF JAMBS AND LAY SPLICES TOO SHORT AND BREAK BY LINE 14
2. MASONRY PROGRESS IN BREAK ROOM OK
PLEASE MAINTAIN 2/3 PENETRATION AT VERTS
INTO BOND BEAM
06/17/2008 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
06/16/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
TRUCKERS BREAK ROOM CMU WALLS 2ND LIFT TO 8 FOOT
06/12/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
(2) 8" INTERIOR CMU WALL STEEL REINFORCEMENT TO 4' AFF
AT PUMP HOUSE
06/11/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
8" CMU INTERIOR WALL STEEL REINFORCEMENT @ ROOMS #404 AND $405
TRUCKERS BREAK ROOM AND TOILET ROOM - 1ST LIFT FROM F.F.E TO 4FT
05/13/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
REINFORCEMENT STEEL @ TILT UP WALL
PANELS #Q-29 THRU 36

TOP OUT @ ELEVATOR SHAFT
05/12/2008 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
05/09/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
AT ELEVATOR SHAFT FROM 16' TO 20'
05/08/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
12" CMU WALL @ ELEVATOR SHAFT FROM 8' ABOVE 2ND FLOOR DECK TO 12' ABOVE -- OK TO GROUT
05/07/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
ALL PROGRESS OK
05/06/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
05/05/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
ALL PROGRESS OK
05/01/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
8" CMU REINFORCEMENT STEEL AT ELEVATOR SHAFT
FROM 12' TO 16' -- OK TO GROUT
04/30/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
8" CMU WALL STEEL REINFORCEMENT FROM 8' TO 12' AFF
AT ELEVATOR SHAFT
04/29/2008 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
CONTRACTOR CANCELLED
04/28/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU MASONRY WALLS @
GRID LINES E/13 TO 13.2 & 13.2/E TO E.5
AND ELEVATOR SHAFT 1ST LIFT FROM 0' TO 8' AFFE
W/CLEANOUTS -- OK TO GROUT
04/25/2008 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
04/24/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
STEEL REINFORCEMENT @ CMU WALLS @ GRID LINES E.5/13 TO 15 FROM 8' TO 12' TOPOUT AND E/13 TO 13.2 AND
13.2/E TO E.5 FROM 4' TO 8' AFF 2 LIFT
04/22/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU WALL REINFORCEMENT STEEL AT GRID E.5/13 TO 15
2ND LIFT TO 8' AFF & E.5 TOE/13.2 AND E/13 TO 13.2 FROM TOP OF STEM TO 4' AFF
04/18/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
REINFORCEMENT STEEL @ CMU
12" NON BEARING PARTITION

WALL ON GRID E.5/13.8 TO 15 -- OK TO GROUT FROM 0' TO 5'
04/17/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
30 L.F OF INTERIOR CMU WALL 8" FROM 0'
TO 5' @ GRID E.5/13 TO 13.5