Inspection History Details
Permit: T07CM04127
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/16/2008 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection :* | |
| 08/08/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* SPECIAL INSPECTOR HAS APPROVED NORTHSIDE OUTSIDE PATIO FOOTING @ ROOF COLUMNS & PERIMETER SLAB FOOTING OK |
|
| 07/10/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* REMAINING DOCK STAIR FOOTINGS LINE 14-28 OK |
|
| 06/24/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 06/23/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 06/20/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 06/19/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1. N/E VEHICLE RAMP WALLS REINFORCEMENT OK 2. DOCK LEVELER CLOSURE POURS BETWEEN LINES A/14 TO 20 |
|
| 06/18/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* LIGHT POLE CAISSONS WEST & N.SIDE TOP OF BASIN 9 EACH FINISH CLEANING OUT DEBRIS & PULL TOPS LEVEL - OK TO PLACE |
|
| 06/16/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 3 SETS OF STAIR STEPS @ SOUTH SIDE FRONT DOCKS |
|
| 06/06/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 3 SPREAD COLUMN FOOTINGS FOR ENTRY CANOPY BY BIG RED THINGY W/HOLE 9.8 TO 10.7 SOUTH OF LINE Q AND 3 STAIRCASE WALLS @ Q/3.3 - Q/4.8 AND Q/6.6 --- OK |
|
| 06/05/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 06/03/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 06/02/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 05/30/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* DOCK LEVELER PIT WALLS @ GRID LINES A/1 TO 8 |
|
| 05/29/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELED |
|
| 05/28/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 12 TOTAL DOCK LEVELER PITS REINFORCEMENT STEEL AT GRID LINES #5 TO #10 |
|
| 05/27/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 5 TOTAL STAIR TREADS @ EXTERIOR NORTHSIDE MAIN DOORS FROM GRID LINE 1 TO 10 -- OK TO POUR |
|
| 05/22/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 1) REINFORCEMENT STEEL, PICK POINTS AND EMBETS AT TILT UP WALL PANELS ON GRID LINE 28 PANELS #S, Z, AA, BB AND CC 2) DOCK LEVELER PITS TOTAL OF 12 ON NORTH SIDE GRID LINES A/1 TO 5 |
|
| 05/21/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | ||
| 05/20/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | STEEL REINFORCEMENT @ TILT-UP WALL PANELS #'S AS FOLLOWS: Q-28, 28-R, 28-S, 28-T, 28-U, 28-V, 28-W, 28-X | |
| 05/16/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* STEEL COLUMN DRY PACK AND POUR BACKS SOUTH OF MEZZANINE BETWEEN LINES 1 TO 7 AT WEST HALF OF BLDG. AND 6 MAN DOOR CONCRETE STAIR SIDES AT GRID LINE A/1 TO 12 |
|
| 05/14/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 05/12/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* REINFORCEMENT STEEL, EMBEDS AND PICK POINTS @ TILT UP WALL PANELS Q/13 THRU 28 |
|
| 05/09/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* CLOSURE POUR REINFORCEMENT AT SOUTH EXTERIOR WALL BETWEEN 8 DOCK LEVELER PITS AT WEST END OF BLDG. |
|
| 05/08/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* TILT UP WALL PANELS @ LINE 28/L,M,N AND P DOCK LEVELER PITS @ LINE Q/3.5 TO 5.5 - 8 TOTAL AND LOADING DOCK WALLS @ N/W CORNER DECK |
|
| 05/07/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* ALL PROGRESS OK |
|
| 05/06/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
| 05/05/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* ALL PROGRESS OK |
|
| 05/02/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* TILT UP WALL PANELS #28/A, 28/B, 28/C, 28/D, 28/E, 28/F, 28/G, 28/H AND 28/J AND 28/K PLUS DOCK RAMP @ N/W CORNER OF BLDG. @ A/1 |
|
| 05/01/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 8 - DOCK LEVELER PITS STEEL REINFORCEMENT @ GRID A/8 TO 10 |
|
| 04/30/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* STEEL REINFORCEMENT & EMBEDS AT TILT UP WALL PANELS #A-43, A-44 & A-45 |
|
| 04/29/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELLED |
|
| 04/28/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* STEEL REINFORCEMENT EMBEDS @ TILT UP WALL PANELS #A-39 THRU 43 (5 PANELS) SPECIAL INSPECTION ACCEPTED |
|
| 04/25/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* EMBEDS, WELD PLATES AND STEEL REINFORCEMENT @ TILT-UP WALL PANELS (6" PANELS) #5, #4, 3, 2 AND 1 (10" PANELS) #A-33, A-34, A-35, A-36 AND A-37 |
|
| 04/24/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* STEEL REINFORCEMENT @ EMBEDS AND TILT UP WALL PANELS #6, #7, #A-20, #A-21, #A-22, #A-28, #A-29, #A-30, #A-31 AND #A-32 |
|
| 04/21/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* PUMP HOUSE TILT-UP PANELS #PH1 THRU #PH4 -- OK TO POUR |
|
| 04/17/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* TILT UP WALL PANELS REINFORCEMENT STEEL FOR GUARD HOUSE - 7 PANELS #GH #1 THRU #GH7 |
|
| 04/16/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* CONCRETE REINFORCEMENT STEEL & EMBEDS AT TILT-UP WALL PANELS #A-24, A-25, A-26, A-27, RT-1, RT-2, RT-3, RT-4 ABOVE PANELS INSPECTED & ACCEPTED BY SPECIAL INSPECTOR |
|
| 04/14/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* CORD REINFORCING REBAR AT TOP OF PANELS TOO SHORT |
|
| 04/11/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* FIRE FIGHTING WATER TANK BASE FOOTING - OK AS INSPECTED BY SPECIAL INSPECTOR |
|
| 04/10/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* EMBEDS & REINFORCEMENT STEEL @ TILT UP WALLS #1-T, A-3, A-5, A-8, A19 & A23 INSPECTED BY SPECIAL INSPECTOR AND ACCEPTED |
|
| 04/09/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* GUARD SHACK FOOTING REINFORCMENT STEEL |
|
| 04/08/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* ON GRADE SLAB @ GRID LINES 29 TO 24/K TO Q |
|
| 04/07/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 04/04/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* CHANGE ORDER FOOTING @ CENTER WALL FOOTING #F GRID 12/A.2 AND TILT WALL PANELS #1-BB - 1D & A2 |
|
| 04/03/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* TILT WALL PANELS AT GRID A/#1, 4 AND 6 AND #1/AA PLUS PUMP HOUSE CONTINUOUS FOOTING OK |
|
| 04/02/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 04/01/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* STEEL REINFORCEMENT @ TILT WALL PANELS #1/U,W,X,Y AND V SPECIAL INSPECTOR ACCEPTED |
|
| 03/31/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 8 OF 10 LIGHT POLE BASES IN SOUTH PARKING LOT AND 12 TILT WALL PANELS @ WALL LINE I/J, K, L, M, N, P, Q, R, S, U, W AND X ---- ACCEPTED BY SPECIAL INSPECTOR |
|
| 03/28/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELED |
|
| 03/27/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* TILT WALL PANEL REINFORCEMENT STEEL @ GRID LINES #1/A, B, C, E, F, G & J - SPECIAL INSPECTOR APPROVED |
|
| 03/26/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* INTERIOR 6" TILT WALL PANELS NUMBERS #8, #9, #10 SPECIAL INSPECTED 12 LIGHT POLE BASES @ FAR NORTH PARKING LOT |
|
| 03/25/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* TILT WALL PANELS REINFORCEMENT STEEL AT PANELS #Q/50, 51, 52, 53, 54, 55, 56, 57, 59, 60 & 61 AS PER PANEL SCHEDULE/EMBED SCHEDULE SPECIAL INSPECTOR ACCEPTED - OK TO POUR |
|
| 03/24/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* TILT PANEL WALLS @ Q/37 & Q/39 AND INTERIOR PANELS 11, 12, 13 AND 14 FOOTING REPAIR @ GRID Q/3 & 7 |
|
| 03/22/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* TILT WALL PANELS NUMBERS Q-38, 40, 41 SPECIAL INSPECTOR ACCEPTED 42 & 43 OK PAID AFTER HRS. INSP. W/CHK#630959 $175.00 |
|
| 03/21/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 03/20/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* TILT WALL PANELS NUMBERS Q LINE #44 THRU #49 OK SPECIAL INSPECTOR ACCEPTED |
|
| 03/19/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* TILT WALL PANELS NUMBERS - #12-BB, 12-I, A-13, A-14, A-15, A-16, A-17 & A-18 FOR A TOTAL OF 9 PANELS |
|
| 03/18/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* MISSING EMBEDS |
|
| 03/17/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 03/14/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* REINFORCEMENT STEEL AT 7-WALL TILT PANEL @ LINE 12 PANEL LETTERS A, B, F, G, H, K, L |
|
| 03/13/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* REINFORCEMENT STEEL AT 10 TILT PANELS NUMBERS 12/EE, DD, CC, AA, N, M, P, E, D & C |
|
| 03/12/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* TILT PANELS #12/Q, R, S, T, U, B, C, W, X, AA, BB, DD, EE |
|
| 03/11/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 03/10/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 03/07/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* FREE STANDING CMU WALL FOOTING @ GRID LINES E.5/13.9 TO 15, E.5/13 TO 13.5, 13.2/E TO E.5 AND E/13 TO 13.2 OK |
|
| 03/06/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 03/05/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 03/04/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* CONTINUOUS WALL FOOTING @ EAST END @ GRID LINES 28/A TO Q AND SPREAD FOOTING @ P/27 OK |
|
| 02/28/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 02/27/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* G COLUMN FOOTINGS AT A.5/12.4, 12.9 & 13.3 D COLUMN FOOTING @ P/27 - RESTROOM FOOTING @ G/21 D COLUMN FOOTING @ G/21 AND CONTINUOUS FOOTING AT A/12 TO 28 -- OK |
|
| 02/26/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* NORTH SIDE PERIMETER WALL FOOTING @ A/12 TO 19 "NO TOP BARS" |
|
| 02/25/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* COLUMN FOOTINGS @ GRID LINES 25 & 26/FROM B TO P OK |
|
| 02/22/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* CANCELED BY CONTRACTOR |
|
| 02/21/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* CANCELED |
|
| 02/20/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* COLUMN FOOTING @ GRID LINES 24 & 25/B TO P OK |
|
| 02/19/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* COLUMN FOOTINGS AT GRID LINES 21-22 & 23/B THRU P |
|
| 02/15/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* RAINED OUT |
|
| 02/14/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* COLUMN FOOTINGS @ GRID LINES 21/B TO P |
|
| 02/13/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* BUILDING COLUMN FOOTINGS "D" REINFORCEMENT STEEL @ GRID LINES 20/B TO P |
|
| 02/12/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 39 EACH "D" COLUMN FOOTINGS @ GRID LINES 17, 18 AND 19/B,C,D,E,F,G,H,J,K,L,M,N & P - AS PER DETAIL #9 ON SHEET S7.1 |
|
| 02/11/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 2 GRADE BEAM REINFORCEMENT STEEL @ GRID LINES 16/H TO K & 16/B TO C W/COLUMN FOOTINGS (5) |
|
| 02/08/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 02/07/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* CONTINUOUS PERIMETER FOOTING REBAR @ GRID LINE Q/FROM 12 TO 28 - AND GRADE BEAMS @ 16/D TO E 16/F TO G - 16/L TO M & 16/N TO P W/8 - "J" COLUMN FOOTINGS |
|
| 02/06/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* AT GRID LINES 8 TO 12/B.5 TO F WITH REINFORCING STEEL |
|
| 02/05/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* RESTROOM TILT PANEL FOOTING AT GRID LINES 3.7 TO 4/C TO C.6 |
|
| 02/04/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* 1) CONTRACTOR CANCELLED-RAINED OUT |
|
| 02/01/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* CONTINUES FOOTING REINFORCEMENT STEEL @ GRID LINES 8.9/FROM Q TO N.1 & N.1/FROM 8.9/TO 12 |
|
| 01/31/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* REINFORCEMENT STEEL @ CONCRETE PILASTER COLUMN @ 10/N PER SHEET S7.1/17 |
|
| 01/30/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 39 - COLUMN FOOTINGS #D @ GRID LINES B THRU P/13 THRU 15 AS PER SCHEDULE ON SHEET S7.1 AND DETAIL S7.1/9 -- OK TO POUR |
|
| 01/29/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELED |
|
| 01/28/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* CONTINUOUS FOOTING @ A/1 CORNER TIE IN, INTERSECTION OF A & 12, LINE A/11 TO 12.1 12/M.5 TO Q & INTERSECTION OF 12 & Q, COLUMN FOOTINGS @ 12/P & 12/N ELEVATOR SHAFT WALLS FROM TOP OF FOOTING TO 6FT ABOVE EAST, WEST & SOUTH WALLS AND GRADE BEAM 8/H TO 8/K WITH 3 J COLUMN FOOTING @ 8/H - J & K OK |
|
| 01/26/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* PAID AFTER HOURS/WEEKEND INSPECTION $150.00 PAID CHECK #627507 BAKER CONCRETE GRADE BEAMS (4) @ GRID LINE 8/D TO E - F TO G - L TO M AND N TO P - INTERIOR SPREAD FOOTINGS @ GRID N.5, P & P.5/9.2 9.5, 10.1, 10.7, 10.95, 11.5 PLUS CONCRETE PILASTER FOOTING @ N/10 AS PER SHEET S7.1/17 |
|
| 01/25/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* GRADE BEAM @ GRID 8/B TO C AS PER SHEET S7.2/2 AND 2-J FOOTINGS @ 8/B & C AND 1-A FOOTING @ 8/B.5 |
|
| 01/24/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* COLUMN FOOTINGS @ GRID 8.3 & 8.7/B & B.5 - PERIMETER FOOTS @ N TO Q/1 & 1/ TO 9/Q & N TO Q/12 PLUS ELEVATOR PIT FLOOR |
|
| 01/23/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* COLUMN FOOTINGS @ GRID 3.7/C & C.7 |
|
| 01/22/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* COLUMN FOOTING @ GRID LINE - B/1.3 TO 4.7 B.5/1.3 TO 4.7 - C/1.3 TO 3.7 & 4.3 C.4/1.3 TO 4.3 AND 5/C |
|
| 01/18/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* MEZZANINE COLUMN FOOTINGS 18 TOTAL @ GRID LINES 5 THRU 7.7/B & B.5 AS PER SHEET S7.1/11 |
|
| 01/17/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* COLUMN FOOTINGS @ GRID LINES 2, 3 & 4/D THRU P AS PER SHEET S7.1 DETAIL 9 |
|
| 01/16/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* COLUMN FOOTINGS AT GRID LINES 5/D TO P AND B/7, 7.3 & 7.7 and B.5/7, 7.3, 7.7 AS PER SHEET S7.1 DETAIL 9 & 13 |
|
| 01/15/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* COLUMN SPREAD FOOTINGS @ GRID LINES 6 & 7/C THRU P AS PER DETAIL 9 ON SHEET S7.1 TOTAL OF 24 |
|
| 01/14/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* CONTINUOUS PANEL FOOTING WEST END @ GRID LINES 1/A TO P.5 -- OK TO POUR |
|
| 01/11/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* COLUMN FOOTINGS @ GRID LINES 10/C,D,E,F,G,H,I,J,K,L,M & N 9/C,D,E,F,G,H,I,J,K,L,M & N AND B/B.5/11, 10.3, 10.6, 10, 9.3, 9.6 AND 9 PER SHEET S2B & S2F AND SHEET S7.1/9 |
|
| 01/10/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* FOOTING AT GRID 12/A TO Q AND COLUMN FOOTINGS @ GRID LINE 11 |
|
| 01/09/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* PERIMETER WALL FOOTING @ GRID LINE A/1 TO 11.5 AS PER SHEET S7.1 DETAIL #11 |
|
| 01/08/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* |