Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/30/2008 | PLUMBING - FINAL | Approved | PER LEERAY | |
| 05/27/2008 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1. PROVIDE CORRECT CLEANOUT PLUG AT BR SINK SEAL PLUG 2. SECURE DW DRAIN HOSE 3. INSTALL MECHANICAL WATER HAMMER ARRESTORS 4. STILL NEED BAC T REPORT AND APPROVAL FOR LAVITORY 5. FIXTURE WATER TESTS OK |
|
| 05/23/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* WORK NOT COMPLETE ALSO; PROVIDE ENGINEER APPROVAL OF TOTO LAVATORIES AND FAUCETS. PROVIDE COPIES OF WATER CERTIFICATIONS REQUIRED BY PLAN SPEC. #21 |
|
| 05/22/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) OPEN FRONT TOILET SEATS 2) COMPLETE WORK, SEAL SINKS AND WATER TEST 3) DW REQUIRES WATER HAMMER ARRESTOR AND HIGH LOOP ON HOSE |