Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/18/2008 | PLUMBING - FINAL | Approved | ||
| 09/16/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. MUST HAVE APPROVED PLAN ON SITE 2. HAVE CLEAN BACTERIA REPORT |
|
| 09/12/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. SEE NOTE FROM 9/11/08 2. SUPPORT DEAD END RUN OF GAS PIPING OVERHEAD 3. CLOSET FLANGES TO EXTEND 1/4" ABOVE FINISHED FLOOR WITH VOIDS FILLED AND FLANGES SECURED 4. ALL SPEC's AND DETAILS TO BE COMPLETED BEFORE YOU CALL FINAL 5. EXPOSE ALL TRIM PIPING FOR INSPECTION I.E. EWV COVERS ETC. 6. REQUIRE 6" FROM TOP OF URINAL TO CRITICAL LEVEL ON FLUSH-O-METER THIS IS NOT A PUNCH LIST LIST MAY NOT BE COMPLETE 7. CONTRACTOR TO PAY REINSPECTION FEE |
|
| 09/11/2008 | PLUMBING - FINAL | Not ready for Inspection | PLEASE CALL IN AND HAVE APPROVED ALL REQUIRED INSPECTIONS PRIOR TO CALLING FINAL |