Permit: T07CM03988

Parcel: 11706183A


Addresses:

1 N 5TH AV


Inspection Status: Approved

Inspection History: BUILDING - FINAL

Permit Number - T07CM03988

Inspection Description - BUILDING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
12/27/2010 BUILDING - FINAL Approved
01/02/2009 BUILDING - FINAL Partial Approval RESIDENTIAL ASPECT COMPLETE. NEED TO COMPLETE SITE.
10/01/2008 BUILDING - FINAL Partial Approval IVRS - Inspection :*
1ST FLOOR OK TO OCCUPY;
CANNOT FINAL UNTIL SITE WORK DONE
09/23/2008 BUILDING - FINAL Not ready for Inspection IVRS - Inspection :*
NEED OTHER FINALS FROM TRADES
09/22/2008 BUILDING - FINAL Not ready for Inspection IVRS - Inspection :*
NEED TRADE FINALS
09/17/2008 BUILDING - FINAL Not ready for Inspection IVRS - Inspection :*
09/11/2008 BUILDING - FINAL Partial Approval IVRS - Inspection :*
OK TCO 2ND FLOOR

TCO WILL BE EXPANDED TO INCLUDE FLOORS 2-6
09/10/2008 BUILDING - FINAL Partial Approval IVRS - Inspection :*
TCO MAY BE EXPANDED FOR 3RD FLOOR

FIX HOLE IN CEILING 203
FIRESTOP FLOOR PENETRATION 203 (DRAIN STACK) 211, 217
FILL IN HOLE IN FLOOR 205, 207, 209
09/02/2008 BUILDING - FINAL Not ready for Inspection IVRS - Inspection :*
1. NEED PLUMB. AND ELEC. APPROVALS FOR 3RD FLOOR
2. NEED TO COMPLETE WORK ON 2ND FLOOR
08/22/2008 BUILDING - FINAL Partial Approval OK TCO FOR FLOORS 4,5,6.
08/20/2008 BUILDING - FINAL Partial Approval IVRS - Inspection :*
NO EXTENDER RINGS REQUIRED FOR
EXISTING OUTLETS IN MASONRY

1. SEAL AROUND WINDOWS @ END OF CORRIDORS FIRESTOP
500 @ ABOVE DOOR PATCH 6TH @ ELEC ROOM SHAFT
2. PROVIDE ELEVATOR AND FIRE APPROVALS
3. I NEED TO CHECK ON MONOKOTE PATCH FOR PENTHOUSE
4. LLOYD TO REPAIR WASH OUT @ N.EXIT
5. USE HOSE TO DRAIN FIRE LINE OUTSIDE OF CURBED AREA
08/19/2008 BUILDING - FINAL Not ready for Inspection IVRS - Inspection :*
1. NEED ELEC. APPROVALS
2. NEED FIRE APPROVALS
3. NEED ITEMS 1, 2, 3, 6 FROM 8.13.08
4. NEED COVERED WALKS COMPLETED
08/15/2008 BUILDING - FINAL Partial Approval IVRS - Inspection :*
08/15/2008 BUILDING - FINAL Partial Approval MET WITH CONCORD SUPERINTENDENT "JEFF" ON SITE TO GO OVER MINIMUM TCO REQUIREMENTS. HE HAS STATED THE FOLLOWING:
1) PEDESTRIAN PROTECTION PER SITE REDLINED PLANS TO BE DONE TODAY
2) ONE OF THE ELEVATORS WILL BE CERTIFIED BY 8-19.
3) LEVELS 4,5,6 WILL HAVE PLUG RECEPTACLES CHECKED AND BE READY FOR INSPECTION BY 8-19.
4) PLUMBING FOR 4,5,6 HAS BEEN APPROVED.
5) MECHANICAL FOR 4,5,6 WILL BE READY ON 8-19 (PENDING SOME PAPERWORK TO BE PROVIDED BY LHANLY TO MRAMBER)
6) FIRE SYSTEM FOR BUILDING IS DONE AND BEING INSPECTED TODAY.

VERACITY OF SCHEDULE ABOVE HAS NOT YET BEEN CHECKED BY THIS INSPECTOR. CONCORD SUPERINTENDENT JEFF HAS INDICATED HE WILL CALL FOR PARTIAL FINAL ON FLOORS 4,5,6 WEDNESDAY OF NEXT WEEK.
08/13/2008 BUILDING - FINAL Not ready for Inspection IVRS - Inspection :*
6TH FLOOR N/R

1. FINISH TRIM & WINDOW @ CORRIDOR ENDS & EXITS
2. INSTALL COVERS ON GARBAGE CHUTES
3. INSTALL GATE TO LIMIT ROOFTOP ACCESS OR PROVIDE GUARD RAILS ON ROOF
4. PROVIDE FIRE, PLUMBING, ELEC, MECHANICAL FINALS
5. ALTER COVERED WALKS AS NOTED
6. PROVIDE ELEVATOR CERTS
7. HOW ARE PEOPLE COMING THROUGH LOBBY? OR ARE YOU GOING TO FINISH LOBBY
08/04/2008 BUILDING - FINAL Not ready for Inspection IVRS - Inspection :*
CANCELED BY CONTRACTOR