Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2008 | FRAMING | Approved | IVRS - Inspection :* | |
| 04/04/2008 | FRAMING | Partial Approval | IVRS - Inspection :* 1) YOU NEED ANOTHER STRINGER IN THE CENTER OF THE STAIRS 2) NEED MINIMUM 6'-8" CLEAR TO CEILING AT BATH FIXTURES 3) OK TO SHEETROCK EXCEPT STAIRS AND BATH |
|
| 03/11/2008 | FRAMING | Partial Approval | IVRS - Inspection :* 1) ADD STUDS AT MID POINT UNDER EACH LPI |
|
| 02/12/2008 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) FROM LAST INSPECTION: BLOCK ALL PLYWOOD PANELS PAGE 4 SEE NOTES 2) 30' SPAN REQUIRES MID PT BEARING, GO BACK TO PLAN CHECK FOR REVISION 3) FROM LAST INSPECTION CUT INSPECTION HOLE TO VERIFY A35, AND 3 16D REQUIRED .148 DIAMETER X 3 1/2" LONG 4) CALL IN INSPECTION 01025 EXT. CLIP, NOT FRAMING |
|
| 01/30/2008 | FRAMING | Not ready for Inspection | IVRS - Inspection :* | |
| 01/29/2008 | FRAMING | Not ready for Inspection | IVRS - Inspection :* |