Inspection History Details
Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/11/2008 | EXT METAL CLIPS/EXT SHEATHING | Approved | IVRS - Inspection :* | |
| 03/03/2008 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SHORE UP GLU LAM ALREADY SAGGING 2) PLAN DOESN'T SHOW 2ND FLOOR INTERIOR BEARING ON PLAN, NOT BUILT AS BEARING 3) SHEAR SCHEDULE CALLS FOR OSB EDGES BLOCKED, 4 EDGES ON A SHEET OF PLYWOOD. HOW MANY EDGES GET BLOCKED ? BLOCK TO BE NAILED AT JOINT TO BOTH PIECES OF PLYWOOD 4) CAN LPI SPAN 29 1/2" (LP1 11 7/8" DEPTH TOP CHORD 2 1/4 X 1 1/2 36A MILL 1069 APA 5) SHEAR BLOCKS AT EDGES TO BE NAILED TO SHEATHING 6" ON CENTER SEE SCHEDULE |
|
| 01/30/2008 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PER <B> ON PAGE FOUR-BLOCK AND NAIL ALL EDGES 2) FRAMING IS DONE WITH ALL INTERMEDIATES 3) SEE PRIOR NOTES ON STAIRS 4) CUT 3 SMALL INSPECTION HOLES AT NORTH AND SOUTH LEDGERS AND SUPPLY LADDER TO INSPECT LEDGER CLIPS |
|
| 01/29/2008 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) CHECK NAILING THROUGHOUT 2) FOUR PLACES MARKED ON SOUTH WALL 3) REMAINDER NOT INSPECTED 4) FRAMING DONE WITH INTERMEDIATES 5) NAIL OFF 6" ON CENTER EDGES ADN 12" ON CENTER FIELD 6) STAIRS DO NOT MEET REQUIREMENTS OF CURRENT CODE. MAX RISER HEIGHT 7 3/4 AND MAX DIFFERENCE IN ANY FLIGHT 3/8" MINIMUM TREAD DEPTH 10" |