Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - CABLE DROP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2008 | ELECTRIC - CABLE DROP | Approved | IVRS - Inspection :* | |
| 09/03/2008 | ELECTRIC - CABLE DROP | Partial Approval | IVRS - Inspection :* 1) BONDING JUMPERS TO 2" RACEWAYS AT DISCONNECTS TO GUTTER NOT SIZED PROPERLY 100 AMP NEEDS #6 & 200 AMPS NEEDS #4 NEC 250.102 & 250.66 2) ADD SERVICE DISCONNECT LABELS TO DISCONNECTS |
|
| 08/27/2008 | ELECTRIC - CABLE DROP | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. NEED TO POST BOND FOR RELEASE OF POWER 2. INSTALL FUSES 3. MARK "SERVICE DISCONNECTS" - "1 OF 2" AND "2 OF 2" 4. TIGHTEN SCREWS ON BONDING LOCKNUTS 5. BOND CHASE NIPPLE 6. ARRANGE GROUNDING CONDUCTORS TO REMOVE OBJECTIONABLE CURRENT 7. HAVE GUTTERS OPEN FOR INSPECTION 8. SERICE CONDUTORS NOT SIZED PER PLAN 9. ENSURE ALL SERVICE RACEWAYS PROPERLY BONDED 10. DOES GUTTER REQUIRE HUBS? |
|
| 06/02/2008 | ELECTRIC - CABLE DROP | Partial Approval | IVRS - Inspection :* 1. OK 2 - 4" PVC FROM SES TO TEP XFMR 2. INSTALL WARNING RIBBON ABOVE RACEWAYS PER NEC 300.5 |
|
| 05/30/2008 | ELECTRIC - CABLE DROP | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PLAN CALLS FOR 2 - 4" RACEWAYS TO BUILDING 2. PLAN CALLS FOR 600 MCM TEP ALLOWS MAX. OF 500 MCM 3. PLAN DOES NOT COVER 4" RACEWAY TO BUILDING #2 |