Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/26/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* RECEIVED (1) IN HOUSE BACKFLOW CERTIFICATION |
|
| 02/22/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE BACKFLOW PROTECTION WITH CERTIFICATION FOR CUSTARD MACHINE PER NOTE #9 OF APPROVED REVISION PLAN. 2. PROVIDE MINIMUM 1" AIR GAP FOR ALL INDIRECT DRAIN TERMINATIONS |
|
| 11/09/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* COMPLY W/PREVIOUS NOTES PERM. CAP FIXTURE OUTLETS NOT BEING USED |
|
| 10/17/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. FLOOR PLAN ON APPROVED PLAN SHALL MATCH PLUMBING FIXTURES SHOWN OR PROVIDE APPROVED REVISED PLAN 2. REMOVED P-TRAP AND CAP DRAIN BESIDE EXISTING LAV IN FRONT 3. 3-COMP SINK REQUIRES WASH & RINSE TO BE DIRECTLY DRAINED THRU P-TRAP AND DRAIN LIKE ANY SINK, SANITIZE CAN BE INDIRECTLY DRAINED WITH APPROVED DRAINAGE FITTINGS & MATERIALS FOR ALL SINK DRAINAGE. |