Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2009 | ENGINEERING - FINAL | Approved | All items on grading plan complete. | |
| 10/02/2009 | ENGINEERING - FINAL | Partial Approval | OK for Temp C of O, need to complete all items on grading punch list prior to final C of O. | |
| 09/30/2009 | ENGINEERING - FINAL | Denied | See comments under grading permit T08BU00372 | |
| 09/23/2009 | ENGINEERING - FINAL | Denied | Call for final grading permit #T08BU00372 ( expired) prior to C of O. Revise grading/site plan to reflect changes to the approved plans. | |
| 05/28/2008 | ENGINEERING - FINAL | Denied | 1) DRAINAGE CULVERT UNDER GYMNASIUM NOT BEING INSTALLED PER APPROVED PLANS. YOU MUST HAVE APPROVED PLANS ON SITE FOR ANY WORK YOU ARE DOING. 2) INSTALLATION OF RCP PIPE UNDER A BUILDING IS A VIOLATION OF THE UNIFORM PLUMBING CODE, REFERENCE: A) SECTION 718.3 2006 UNIFORM PLUMBING CODE "No building sewer or other drainage piping or part thereof, which is constructed of materials other than those approved for use under or within a building, shall be installed under or within 2 feet of a building...." B) SECTION 701.1 OF THE UPC LIST MATERIALS ALLOWED UNDER A BUILDING, RCP IS NOT ONE OF THEM. C) INSTALLATION STANDARD 1 OF THE 2006 UPC SEC. 3.6 CONCRETE SEWER PIPE; 3.6.1 MINIMUM STANDARDS; 3.6.5 "...Concrete sewer pipe shall be installed not less than 1 foot below the ground and not closer than 2 feet to a building . |