Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2009 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 02/05/2009 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 01/26/2009 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1. CONCESSIONS, LOBBY #101, #102, RESTROOM 103, 104 ROUGH SOIL TEST OK (ONLY) |
|
| 01/23/2009 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1. CONCESSIONS #101 IN WALL WATER TEST OK AND VENT IN WALL TEST OK |
|
| 01/22/2009 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 2 1/2, 1 1/2, 3/4, WATER PIPING FOR RETURN DUCT TO NEW BUILDING TEST OK TO NEW WITHIN 5' ONLY |
|
| 12/31/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) WEST SIDE ROUGH SOIL FOR GYM TEST OK 2) MAIN LOBBY RESTROOM PRE-SLAB OK |
|
| 12/30/2008 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) REPAIR LEAKS 2) COMPLETE PRE-SLAB |
|
| 12/08/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1. REDLINE ROOF DRAIN ON APPROVED PLANS 2. GRADE ON 4" FROM P-9 TO R3H OK |
|
| 12/01/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* #002 MENS RESTROOM ROUGH-SOIL PROVIDE APPROVED GRADE ON 4" FROM P-9 TO P-3H OTHER ROUGH SOIL OK |
|
| 11/19/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1. 003 WOMENS ROUGH SOIL TEST OK 2. STUB UP IN 002 MENS RESTROOM (ONLY) TEST OK |
|
| 11/18/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* PER HIGHLIGHT ON PAGE P-101 |
|
| 07/16/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | ALL 24" CONCRETE ENCASED SDR UNDER GYMNASIUM OK. CONCRETE COVER OK. AIR TEST AT 5 LBS OK. OK TO COVER. | |
| 07/09/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | 4 SECTIONS OF SDR DRAINAGE CULVERT GOING NORTH FROM MANHOLE OK TO COVER WITH CONCRETE. [MANHOLE NOT IN, CONNECTION FROM MANHOLE SOUTH-EAST TO EXISTING RCP NOT MADE YET. | |
| 06/23/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* HIGHLIGHT ON PAGE C-302 |
|
| 06/13/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | 26' OF 2" C.I.P CONNECTED TO EXISTING AND TURNED TO EAST OF WRESTLING ROOM OK TO COVER. REF. PP P-101. | |
| 05/28/2008 | PLUMBING - ROUGH, SOIL | Denied | 1) DRAINAGE CULVERT UNDER GYMNASIUM NOT BEING INSTALLED PER APPROVED PLANS. YOU MUST HAVE APPROVED PLANS ON SITE FOR ANY WORK YOU ARE DOING. 2) INSTALLATION OF RCP PIPE UNDER A BUILDING IS A VIOLATION OF THE UNIFORM PLUMBING CODE; REFERENCE: A) SECTION 718.3 2006 UNIFORM PLUMBING CODE "No building sewer or other drainage piping or part thereof, which is constructed of materials other than those approved for use under or within a building, shall be installed under or within 2 feet of a building...." B) SECTION 701.1 OF THE UPC LIST MATERIALS ALLOWED UNDER A BUILDING, RCP IS NOT ONE OF THEM. C) INSTALLATION STANDARD 1 OF THE 2006 UPC SEC. 3.6 CONCRETE SEWER PIPE; 3.6.1 MINIMUM STANDARDS; 3.6.5 "...Concrete sewer pipe shall be installed not less than 1 foot below the ground and not closer than 2 feet to a building . |
|
| 05/27/2008 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* PROVIDE APPROVED PLANS FROM CITY OF TUCSON |