Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T07CM03815
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/15/2009 | ENGINEERING - FINAL | Approved | H/C PARKING HAS BEEN RE-ASPHALTED NO MORE THAN 2% SLOPE | |
02/10/2009 | ENGINEERING - FINAL | Partial Approval | LOOKED OVER THE SITE AND THE PREVIOUS COMMENTS DATED 2/4/09 AND HAVE DETERMINED THE FOLLOWING: THE ONLY REMAINING ITEMS ARE ITEMS 1) ADDRESS H/C PARKING SLOPE EXCEEDING 2%, AND ITEM 2) ADDRESS NW H/C RAMP LOCATION SLOPE EXCEEDING 8.33% (11%) OF THE PREVIOUS LIST. THESE ITEMS WILL NEED TO BE COMPLETED AND READY PRIOR TO REQUESTING A FINAL INSPECTION TO PREVENT A RE-FEE. | |
02/04/2009 | ENGINEERING - FINAL | Denied | -ADDRESS H/C PARKING SLOPE > 2% -ADDRESS NW RAMP LOCATION SLOPE > 8.33% (11%) -INSTALL HAND RAILS ON EAST RAMP -CLEAN OUT SCUPPERS AT S SIDE OF BLDG -COMPLETE ALL LANDSCAPE -REMOVE PORTA TOILET |
|
01/26/2009 | ENGINEERING - FINAL | Denied | NOT READY 1. NORTHEAST HANDICAP RAMP RUN GREATER THAT 6' OR RISE GREATER THAN 6" REQUIRES HANDRAIL ON BOTH SIDES. 2. PROVIDE BICYCLE PARKING 3. COMPLETE ALL ITEMS LISTED ON PREVIOUS INSPECTIONS. |
|
01/13/2009 | ENGINEERING - FINAL | Denied | NO ANSWER AT 11:40 AND 12:13 PER HVAC CONTRACTOR SUPER NOT ON SITE-LEFT PAPER WORK WITH D&J -SITE WORK NOT COMPLETE -DEBRIS NOT CLEANED UP -TRACK OUT NEEDS TO BE SWEPT -TRASH ENCLOSURE NOT COMPLETE -PORTA TOILET STILL ON SITE -ROLL OFF DUMPSTER STILL ON SITE |
|
12/11/2008 | ENGINEERING - FINAL | Denied | SITE NOT READY AT THIS TIME FOR A CERTIFICATE OF OCCUPANCY. THE FOLLOWING ITEMS ARE JUST A FEW THAT WILL BE NEEDED PRIOR TO REQUESTING A FINAL ENGINEERING INSPECTION FOR THIS SITE. COMPLETE ALL EXTERIOR WORK, REMOVE ALL EXCESS LANDSCAPE MATERIAL FROM THE ADJACENT DRAINAGEWAYS. |