Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/09/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* RECEIVED LANDSCAPING BACKFLOW CERTIFICATION AND CHLORINE & BACTERIA REPORT |
|
| 02/04/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE A TRAFFIC RATED CLEAN OUT COVER FOR CLEAN OUT AT INTERCEPTOR 2. EXPOSE TRACER WIRE FOR SITE SEWER AT 2-WAY CLEANOUT 3. PROVIDE APPROVED SUPPORT FOR T&P DRAIN 4. EXPOSE LANDSCAPING WATER SUPPLY & PROVIDE CERTIFICATIONS FOR ALL BACKFLOW DEVICES 5. FLUSH HANDLE ON STOOL TO BE TO WIDE SIDE OF RESTROOM 6. REPAIR LEAK AT MIXING VALVE OF SOUTH LAV 7. PROVIDE CHLORINE AND BACTERIA REPORT FOR POTABLE WATER SYSTEM 8. SUPPORT & SECURE EXPANSION TANK AT WATER HEATER |