Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T07CM03815
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/10/2009 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
02/09/2009 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* COMPLETE ITEMS #11 AND #12 FROM PREVIOUS INSPECTION CHECK WITH BUILDING INSPECTOR FOR TCO |
|
02/04/2009 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. MARK "SERVICE DISCONNECTS" 2. INSTALL BOX EXTENSION FOR SWITCHES IN TILE BOX MORE THAN 1/4" BACK 3. HAVE WIRES HANGING OUT AT CEILING 4. PLAN CALLS FOR 30a RECEPTS ON A19 & A21 HAVE 20 AMP RECEPTS ON 30a CIRCUITS 5. PLAN CALLS FOR 15a FUSES FOR AUTO LIFTS 6. NEED SERVICE RECEPT. WITHIN 25' OF AC UNIT 7. MOUNT PHONE 611 IN SEPARATE JUNCTION BOX DO NOT WIRE THROUGH AC DISCONNECT 8. INSTALL 45a FUSES FOR AC UNIT 9. MISSING OUTDOOR EM LIGHT 10. PROVIDE HANDLE LOCK ON CIRCUIT B-16 AND B-24 PER PLANS 11. ALL RECEPTACLES IN SERVICE BAY TO BE GFI PROTECTED NEC 511.12 12. EM LIGHTING IN SHOP AREA TO MEET REQUIREMENTS OF NEC 700.16 13. ARE ALL METAL PIPING SYSTEMS BONDED? |