Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/28/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* SUPPORT 1/2 INDIRECT DRAIN FROM ESPRESSO W/APPROVED PIPE CLAMPS. CORRECT DIP IN DRAIN HOSE. PROVIDE SLOPE THROUGHOUT |
|
| 05/23/2008 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1. NEED COPIES OF YOUR INTERNAL BACKFLOW ASSEMBLY CERTIFICATIONS AND BACTERIA REPORT. 2. HARD PIPE BACKFLOW AT COFFEE; CONNECT DRAIN AND WATER TO ESPRESSO MACHINE 3. SEAL CO PLUGS 4. SUPPORT AND ENSURE 1" AG AT ID WASTE 5. SUPPORT ID WASTES FROM SODA |
|
| 05/21/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* - COMPLETE PREVIOUSLY NOTED ITEMS. - CLEANOUTS, PRIMER, TRAPS - AG PROPER USE OF DRAINAGE FITTINGS ON ID WASTES - CORRECT LEAKS - HARD PIPE TO BACKFLOW ASSEMBLIES AT COFFEE & ESPRESSO - EXTEND VENT TO 3' ABV AIR INTAKE - PROTECT FROM UV RAYS |
|
| 05/20/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 05/15/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* - COMPLETE ALL WORK, INSTALL ALL EQUIPMENT THAT HAS WATER AND DRAIN CONNECTIONS - PROVIDE BACTERIA REPORT AND BACKFLOW CERTS - PROVIDE ACCESS TO ALL CLEANOUTS - PROVIDE VAC BREAKERS ON EXTERIOR HOSE CONNECTIONS - PROVIDE ACCESS TO ROOF - PROPERLY INSTALL SINKS - CAULK ALL FIXTURES - CORRECTLY INSTALL ALL INDIRECT WASTE PIPING; CLEANOUTS, PVC PRIMER, PROPER SUPPORTS, TRAPS AS REQUIRED, SLOPE; ID PIPING CANNOT COMBINE SEE UPC CHPT. 8 801, 803 |
|
| 05/13/2008 | PLUMBING - FINAL | Cancelled | CANCELED PER WAYNE 240-1845 |