Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - TEMP POWER FOR TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/08/2008 | ELECTRIC - TEMP POWER FOR TEST | Approved | IVRS - Inspection :* | |
| 01/07/2008 | ELECTRIC - TEMP POWER FOR TEST | Not ready for Inspection | IVRS - Inspection :* NOT ACCESSIBLE DUE TO STUCCO |
|
| 01/04/2008 | ELECTRIC - TEMP POWER FOR TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. GROUNDING ELECTRODE CONDUCTOR TO CONNECT DIRECTLY TO SERVICE NEUTRAL OR VIA A MAIN BONDING JUMPER 2. USE CORRECT SIZED PIPE CLAMPS AND TIGHTEN 3. IDENTIFY "SERVICE DISCONNECTS" AS SUCH 4. TIGHTEN ALL CONNECTIONS 5. ARRANCE BONDING CONDUCTORS TO PREVENT OBJECTIONABLE CURRENT |
|
| 12/28/2007 | ELECTRIC - TEMP POWER FOR TEST | Not ready for Inspection | IVRS - Inspection : STILL WAITING FOR REVISED SINGLE LINE DIAGRAM |
|
| 12/27/2007 | ELECTRIC - TEMP POWER FOR TEST | Not ready for Inspection | IVRS - Inspection :* 1) APPROVED PLANS TO BE ON SITE |
|
| 12/24/2007 | ELECTRIC - TEMP POWER FOR TEST | Not ready for Inspection | IVRS - Inspection :* |