Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/03/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 01/29/2008 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1. ONLY HAVE TO SEE TUCSON WATER METER INSTALL PIPING FROM METER THRU RPB & INTO BUILDING FOR FINAL - RECEIVED CLEAN BACTERIA REPORT FOR POTABLE WATER SYSTEM AND (12) IN HOUSE BACKFLOW CERTIFICATIONS. - COMPLETE DRAIN FROM ULTRA STERILIZER INTO RECEPTOR PRIOR TO USE |
|
| 01/28/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* SEE SHEET FROM 1/25/08 AND COMPLY WITH CORRECTION AND PROVIDE VACUUM BREAKER AT REAR HOSE BIB & TERMINATE CLEANOUTS & BACKWATER VALVE WITH TRAFFIC RATED COVERS |
|
| 01/25/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. ULTRA SINK STERILIZER WILL REQUIRE CORRECT INDIRECT DRAIN PIPING & TERMINATION OF PIPING INTO APPROVED INDIRECT DRAIN RECEPTOR 2. TERMINATE ALL DRAINS IN MECH. ROOM WITH SUPPORTS AND 1" AIR GAP 3. PROVIDE CLEAN BACTERIA REPORT FOR POTABLE WATER SYSTEM. 4. COMPLETE YARD WATER TO METER FROM C.O.T WATER AFTER METER IS SET 5. PROVIDE IN HOUSE BACKFLOW CERTIFICATIONS 6. PROVIDE THIRD PARTY SIGN OFF FOR MEDICAL GAS SYSTEM 7. COMPLETE WATER TO TUCSON METER WITH CORRECT BACKFLOW PROTECTION AFTER C.O.T WATER METER IS SET CALL IN 03089 & 03090 |
|
| 01/23/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* |