Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/25/2008 | ELECTRIC - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 01/09/2008 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. OK FLOOR BOXES @ NURSES STATION 2. OK CEILINGS PHASE 1 NEED TO CHECK EXITS AT FINAL |
|
| 11/27/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) OK WALLS NORTH SIDE OF PROJECT SHEET E1.0 2) OK PANEL WALLS |
|
| 11/21/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* OK WALLS FOR SWITCHES 1. INDIVIDUALLY SUPPORT CONDUIT. CANNOT BE SUPPORTED FROM ONE ANOTHER |
|
| 11/16/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. PROTECT MC CABLE AT SHALLOW STUDS 2. SUPPORT MC CABLE WITHIN 12" OF BOXES 3. JUNCTION BOXES TO BE ACCESSIBLE 4. SUPPORT CONDUITS ABOVE PANELS 5. SWITCHES TO BE AS PER 517.13(A) OK WALL E1.1 EXCEPT PATIENT CARE ROOMS & PANEL WALL |