Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - SERVICE UPGRADE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/30/2007 | ELECTRIC - SERVICE UPGRADE | Approved | IVRS - Inspection :* | |
| 11/29/2007 | ELECTRIC - SERVICE UPGRADE | Not ready for Inspection | IVRS - Inspection :* | |
| 11/28/2007 | ELECTRIC - SERVICE UPGRADE | Partial Approval | IVRS - Inspection :* | |
| 11/27/2007 | ELECTRIC - SERVICE UPGRADE | Not ready for Inspection | IVRS - Inspection :* | |
| 11/13/2007 | ELECTRIC - SERVICE UPGRADE | Partial Approval | IVRS - Inspection :* 1) LABEL ALL PANELS USE PERMANENT LABELS 2) LB COVER NEEDS TO BE ACCESSIBLE 3) PLUG UNUSED BREAKER OPENINGS 4) TERMINATE #4 GROUNDING ELECTRODE CONDUCTOR 5) STRAP SEAL TIGHT CLOSER TO END AT ROOF, SUPPORT 3/4" EMT, STRAP 1 1/4" PVC PROPERLY 6) SUPPORT #4 BARE TO WALL 7) CABLES IN WALLS NEED TO BE 1 1/4" MIN FROM FACE OF WALL. SEE NOTE #5 |
|
| 10/03/2007 | ELECTRIC - SERVICE UPGRADE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. LABEL EQUIP. 2. NO MAINS, NO/RISER CONDUCTORS 3. NEED TO VERIFY GROUNDING AT SERVICE 4. REMOVE BOND BETWEEN NEUTRAL & GROUND BAR IN SUB-PANEL 5. PERMIT IS FOR #4, WHAT ABOUT #3 6. ALSO, NOTE THAT POWER WILL NOT BE RELEASED WITH UNTERMINATED WIRING INSIDE UNIT, ALSO OUTSIDE. |