Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/17/2007 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 09/18/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. REVISE PANEL DIRECTORY TO SHOW ADDITION OF PN CKT AND ALTERATIONS OF CKT'S (TWIN BREAKERS) TO MAKE ROOM FOR PN BREAKER - MAKE SURE THEY ARE CORRECTLY IDENTIFIED 2. ALTERED CKTS WITH SHARED NEUTRALS TO TERMINATE ON SEPARATE PHASES 3. TWO #8 STRANDED NOT TO BE UNDER SAME SCREW IN METER BASE 4. NEED SEALING TYPE LOCKNUT, SIDE ENTRY INTO METER BASE 5. PROVIDE PROPER WRENCH TO OPEN INVERTER PARTIAL INSPECTION |