Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T07CM03581
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/18/2010 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 02/16/2010 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 01/04/2010 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) SUPPORT UPSTREAM PIPING AT BLDG WITH SLOPE 2) TEST DOWNSTREAM PIPING, AND FILL INTERCEPTOR TO LID LEVEL |
|
| 10/23/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* UNDERGROUND FOR WATER FEATURE AT STAIRWALL OK TO COVER |
|
| 10/21/2009 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 10/14/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) R.E.I. BLDG DRAIN TIED INTO SANITARY SEWER OK-OK TO COVER 2) INTERCEPTOR INLET, OUTLET AND VENT OK TO COVER 3) PVC DRAIN FROM ONE ESCALATOR PIT TO SECOND ESCALATOR PIT-OK TO COVER 4) DRAIN FOR SUMP INSTALLED OK |
|
| 10/09/2009 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NO PSI ON FOUNTAIN PIPING, GAUGE READING ZERO 2) IMPROPER HCS CONNECTION AT BLDG 3) REMOVE UNLAWFUL HOSE CONNECTION AT RP AT CHEESE CAKE FACTORY |
|
| 10/02/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) AT R-39 SEWER TIE IN OK 2) 6" SANITARY SEWER CONNECTION AT U-36 OK TO COVER |
|
| 09/29/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) FOUNTAIN AT "C" AND AT CHEESECAKE FACTORY U.G. OK TO COVER AS INITIALED ON PLAN 2) AT REI BUILDING PVC MAINS UNDER FLOOR OK TO COVER |
|
| 09/28/2009 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 09/14/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) INTERCEPTOR TEST REVEALED 2 MINOR LEAKS. REPAIR LEAKS, RETEST AND THEN OK TO COVER 2) OK TO CONNECT GREASE WASTE TO INTERCEPTOR |
|
| 09/11/2009 | PLUMBING - INTERMEDIATE | Partial Approval | 1) INTERCEPTOR WATER TEST SHOWS 2 PIN HOLE LEAKS 2) JENSEN TO REPAIR, THEN IT IS OK TO COVER |
|
| 09/10/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) 4" GREASE WASTE, 2 PLACES, EXTENDED TO INTERCEPTOR LOCATION. INTERCEPTOR SET. TEST INTERCEPTOR TO LID 2) OK TO COVER GREASE WASTE |
|
| 08/31/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) FUTURE WASTE 4' N/H OVERHEAD TO #375 OK 2) NEED TO SEE CONNECTIONS AT BOTH ENDS |
|
| 08/24/2009 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) BLDG "B" 15" STORM DRAIN WITH 6" RISER BELOW GRADE WITH TEST OK |
|
| 07/27/2009 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 07/15/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) 4" N/H RAINWATER LEADS AT ENTRY TO "0" BOTH SIDES OK TO COVER |
|
| 07/08/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) 6" PVC SEWER AND 4" TO GREASE TRAP AND FLOOR DRAINS TO OUTSIDE BLDG-OK 2) NEED TO SEE TIE IN AT P.O.C. TO EXISTING |
|
| 07/06/2009 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) BLDG "E" PVC UNDERGROUND-NO TEST ON SYSTEM 2) PVC TO BE LAID ON A FIRM BED, BRIDGING NOT PERMITTED |
|
| 11/06/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 6" STORM DRAIN AT BLDG "B" |
|
| 11/04/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. BLDG "C" - 2" WATER TO OVERHEAD WITH 2 STUBS FOR FUTURE AND STUB UP FOR FOREVER 21 2. PVC UNDERGROUND FOR FOREVER 21 TO TIE IN AT EXISTING OK 3. BLDG "D" - 10" ROOF DRAIN FROM OVERHEAD TO TIE IN AT STORM DRAIN, OK TO COVER 4. 10" PVC ROOF DRAIN ON EAST SIDE OF BLDG "D" CONNECTED TO STORM DRAIN OK |
|
| 10/31/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 10/28/2008 | PLUMBING - INTERMEDIATE | Partial Approval | AT BLDG. "D" - 6" BLDG. DRAIN TIED INTO BLDG AND TIED INTO EXISTING OK | |
| 10/23/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* BLDG. "D" 4 - 1 1/2" STUBS AT BLDG. CONNECTED TO 2 - 2" RPPBP's INSIDE BLDG. 4 - 1 1/2" STUBS RECONNECTED TO 2 - 2" RISERS OVERHEAD. BLDG. "C" 4" N/H OVERHEAD TO TIE IN AT EXISTING OK EXTENDED OUT TO COLUMN RC AS REDLINED ON APPROVED PLAN |
|
| 10/14/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* BLDG. "D" 1. 6" SEWER FROM CROSSING TO P.O.C AT 8" CONNECTION NOT MADE 4 - 1 1/2" TYPE "K" COPPER WATER STUBS NEXT TO COLUMN OUTSIDE TO BLDG. TO INSIDE MECH. ROOM PER REDLINES OK TO COVER 2. 12" PVC STORM DRAIN AT BLDG. "A" OK TO COVER NEED TO SEE FINAL CONNECTIONS |
|
| 09/30/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. OK TO INSULATE 2" MAIN OVER VICTORIA's SECRET 2. STORM WATER PIPING FOR BLDG. "D" AS PER REDLINES OK TO COVER SUBJECT TO REVISED APPROVED PLAN |
|
| 09/25/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* BLDG "C" AT SUMP PIT -- OK TO COVER |
|
| 09/24/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* WORK COVERED BEFORE INSPECTED ON BLDG. "D" BLDG. "C" UNDERGROUND FOR FUTURE STUBS OK TO COVER |
|
| 04/04/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* PVC SCH 40 - 4" BUILDING DRAIN AS HIGHLIGHTED ON P201 ALONG COLUMN 23 OK TO COVER WATER TEST OK |