Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - ABOVE CEILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/27/2007 | ELECTRIC - ABOVE CEILING | Approved | IVRS - Inspection :* | |
| 09/25/2007 | ELECTRIC - ABOVE CEILING | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 09/21/2007 | ELECTRIC - ABOVE CEILING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. MC CABLE TO CLOSE TO FACE OF STUD MUST HAVE 1 1/4" MIN. CLEARANCE TO PROTECT FROM SCREWS PER NEC 2. SUPPORT MC WITHIN 12" OF TERMINATIONS & AT 6' INTERVALS PER NEC CABLES, DATA TO BE SUPPORTED TO STRUCTURE. CEILING GRID WIRES ARE NOT TO BE USED TO SUPPORT WIRING, RACEWAYS WHEN USING WIRES TO TIE OR SUPPORT, THEY MUST BE TIED OFF AT BOTH ENDS |