Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/04/2007 | BUILDING PRE-SLAB | Approved | IVRS - Inspection :* | |
| 09/11/2007 | BUILDING PRE-SLAB | Not ready for Inspection | IVRS - Inspection :* 1) NEED TEMP GLASS AT BATHROOM 2) PLUMBING PROBLEM-VERIFY THE UNDERGROUND SOIL AND SEWER 3) MINIMUM SIZE VTR IS 2" SHOWN ON PLAN 1 1/2" VTR AT ROOF PENETRATION NOW 4) H20 LINE VERIFICATION 2 FIXTURES PER 1/2" MAX 5) REAR SHED SET BACKS NOT ON PLOT PLAN 6) REAR SHED FED WITH 1 RED, 2 BLACK, 2 GREY AND 1 GREEN RUN IN METAL CONDUIT UP TO SHED. GRD. IS IT SIFFICIENT ? 7) CLEANOUT FOR ADDITION |