Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2009 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection :* SPOKE WITH G.DABBS - OK |
|
| 01/30/2009 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* REMAINING FENCE COLUMN FOOTINGS |
|
| 01/29/2009 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 20 OF 27 FENCE PIERS FOOTING ON NORTH & EAST SIDE OK AS PER S-5 DETAIL 18 |
|
| 09/10/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1. DUMPSTER ENCLOSURE OK TO TOP OUT 2. 4 COURTYARD PEDESTALS OK TO POUR 3. 8 COLUMN PEDESTALS N. SIDE OF BLDG. OK TO POUR 4. NEED APPROVED REVISED PLANS FOR ANY STRUCTURAL CHANGES 5. SITE WALLS OK TO TOP OUT #4 - 4' O.C W/#4 BOND BEAM |
|
| 09/09/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 15 LIGHT POLE CAISSONS WITH SPECIAL OK TO POUR 1. 2 MISSING BOLTS TO BE VERIFIED BY SPECIAL INSPECTOR |
|
| 09/02/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* SOUTH AND EAST SITE WALL FOOTING -- OK TO POUR CONCRETE END WALL -- OK TO POUR |
|
| 08/29/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1. 4 - #F-2 SPREAD FOOTING @ COURTYARD @ GRID LINES 4 TO 5/A TO C 2. 8 SPREAD COLUMN FOOTINGS #F-4's AT COLUMN LINE A 3. TRASH ENCLOSURE FOOTING AND 4. EAST SITE WALL FOOTING |
|
| 08/14/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* REMAINING INTERIOR F1, F3, F4 COLUMN FOOTINGS |
|
| 08/07/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) REMAINING FOOTING WEST 1/2 OF BLDG 4 INTERIOR F4 COLUMN FOOTINGS EAST 1/2 2) NEED SPECIAL INSPECTION CERT SIGNED BY BLDG OFFICIAL POSSIBLE HOLD ON INSPECTIONS WITHOUT IT |
|
| 08/06/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) ? FOOTINGS THAT WERE LOOKED AT 8/5-NINYOT MOORE ON SITE |
|
| 08/05/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* WF2 & WF1 E 1 TO 4 A-6.4-7 AROUND CORNER SPECIAL INSPECTED BY NINYO & MOORE NEED SIGNED SPECIAL INSPECTION CERTIFICATE APPROVAL |
|
| 08/04/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1. PATIO FOOTING A TO C LINE 4 & 5 C - 4 TO 5 2. RADIUS FOOTING AT FRONT OF BLDG. 3. SPECIAL INSPECTION OF MISSING VERTS TO BE DONE BEFORE POUR |
|
| 08/01/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* WORKING ON GB 4 TO 5 A TO C |
|
| 07/31/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* CANCELED BY CONTRACTOR |
|
| 07/30/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* WALL FOOTINGS A 5 TO 6.3 7 A.3 TO E E 7 TO 5.2 WITH F5 AND F2 SPREAD FOOTINGS SPECIAL INSPECTED NINY O AND MOORE |