Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/12/2007 | PLUMBING - INTERMEDIATE | Approved | OK TO COVER ALL AREAS | |
| 10/08/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 10/05/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. PLAN CALLS FOR ABS DWV - INSTALLED IS ABS 2. CONNECTION TO EXISTING TO BE MADE IN AN APPROVED MANNER 3. ABS IS TO BE SUPPORTED AT EACH CHANGE OF DIRECTION OR ELEVATION AND AT THE END OF BRANCHES, THEN NO MORE THAN FOUR FEET BETWEEN HANGERS. IS-5 2006 UPC 4. HANGERS TO BE PER NOTE #6 - PLUMBING GENERAL NOTES P-1 5. ALL VERTICAL PIPING REQUIRES SUPPORT 6. FINISH OVERHEAD PIPING 7. NEED TO SEE CLOSET FLANGE |