Permit: T07CM03485

Parcel: 135064010

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
10/31/2013 ENGINEERING - FINAL Approved DAVID RIVERA AND I HAVE WALKED THROPUGH THE SITE AND FEEL THAT THE ISSUES RAISED DURING THE PREVIOUS INSPECTIONS WHILE UNDER CONSTRUCTION. THIS SITE IS APPROVED AT THIS TIME WITH THE FOLLOWING COMMENT: THERE ARE EXISTING CONDITIONS THAT MAKES THE SITE NOT FULLY ACCESSIBLE AT THIS TIME, THESE ITEMS MAY NEED TO BE ADDRESSED IN THE FUTURE IF THE SITE IS PLACED UNDER A NEW REMODEL PERMIT.
10/30/2013 ENGINEERING - FINAL Partial Approval WALKED THROUGH THE SITE WITH THE PLANS, MOST OF THE SITE LOOKS COMPLETE AT THIS TIME. I HAVE ASKED DAVID RIVERA TO WALK THE SITE WITH ME TOMORROW TO ENSURE THAT THE ISSUES HAVE BEEN ADDRESSED FOR ADA ACCESS.
10/29/2013 ENGINEERING - FINAL Partial Approval LOOKED AT THE SITE BUT HAVE DETERMINED THAT I WILL NEED A COPY OF THE ORIGINAL PLAN TO ACCESS THIS SITE. I WILL REVISIT THE SITE TOMORROW WITH THE PLANS FOR A FINAL INSPECTION.
04/16/2009 ENGINEERING - FINAL Denied -H/C PARKING SIGNS MISSING BOTH E AND W SIDE PARKING
-WHEEL STOPS MISSING BOTH E AND W SIDE PARKING
-CLEAN UP ALL WASHOUT AND CONSTRUCTION DEBRIS
-ADDRESS LOOSE METAL IN FRONT PARKING AREA ON EAST SIDE OF PROJECT
-NEED COT APPROVED STAMPED DRAWING FOR ACCESSIBLE ROUTE
-ADA ROUTE NEEDS TO ADDRESS W SIDE OF ACCESSIBLE UNITS. NO ACCESSIBLE ROUTE AT S SIDE OF E H/C PARKING AREA-DOES THIS NEED TO BE SIGNED AS SUCH?
-H/C ACCESSIBLE UNITS DO NOT HAVE LANDING AT ACCESS POINT ON E SIDE OF BLDG
see pics 3502-3509
-COMPLETE ALL SITE WORK, ONCE SITE WORK COMPLETE REMOVE SEDIMENT CONTROLS
04/09/2009 ENGINEERING - FINAL Not ready for Inspection NO MORE BUILDING APPROVALS UNTIL H/C PARKING CP ON BOTH E AND NW SIDE OF PROJECT

ALL OUTSTANDING ADA ISSUES MUST BE ADDRESSED-INCLUDING A STAMPED/APPROVED PLAN FOR ADA ROUTE
03/31/2009 ENGINEERING - FINAL Partial Approval BUILDINGS A, B, I, J, K, L STILL IN ISSUED STATUS
ADA ISSUES TO BE ADDRESSED STILL OUTSTANDING
02/06/2009 ENGINEERING - FINAL Partial Approval SEE PICS 250581-250582
-UNITS 157/158
ASPHALT NOT COMPLETE
SLOPES DO NOT MEET REQMTS HOWEVER CONCERN REGARDING GATE OPENING AND APPLICABLE CLEARANCES
SEE FIG 25 ADAAG (4.13) OR ANSI

ADAAG 4.8 FOR RAMPS
VERIFY SIGNAGE REQMTS FOR SW CORNER OF BLDG