| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/31/2013 | ENGINEERING - FINAL | Approved | DAVID RIVERA AND I HAVE WALKED THROPUGH THE SITE AND FEEL THAT THE ISSUES RAISED DURING THE PREVIOUS INSPECTIONS WHILE UNDER CONSTRUCTION. THIS SITE IS APPROVED AT THIS TIME WITH THE FOLLOWING COMMENT: THERE ARE EXISTING CONDITIONS THAT MAKES THE SITE NOT FULLY ACCESSIBLE AT THIS TIME, THESE ITEMS MAY NEED TO BE ADDRESSED IN THE FUTURE IF THE SITE IS PLACED UNDER A NEW REMODEL PERMIT. | |
| 10/30/2013 | ENGINEERING - FINAL | Partial Approval | WALKED THROUGH THE SITE WITH THE PLANS, MOST OF THE SITE LOOKS COMPLETE AT THIS TIME. I HAVE ASKED DAVID RIVERA TO WALK THE SITE WITH ME TOMORROW TO ENSURE THAT THE ISSUES HAVE BEEN ADDRESSED FOR ADA ACCESS. | |
| 10/29/2013 | ENGINEERING - FINAL | Partial Approval | LOOKED AT THE SITE BUT HAVE DETERMINED THAT I WILL NEED A COPY OF THE ORIGINAL PLAN TO ACCESS THIS SITE. I WILL REVISIT THE SITE TOMORROW WITH THE PLANS FOR A FINAL INSPECTION. | |
| 04/16/2009 | ENGINEERING - FINAL | Denied | -H/C PARKING SIGNS MISSING BOTH E AND W SIDE PARKING -WHEEL STOPS MISSING BOTH E AND W SIDE PARKING -CLEAN UP ALL WASHOUT AND CONSTRUCTION DEBRIS -ADDRESS LOOSE METAL IN FRONT PARKING AREA ON EAST SIDE OF PROJECT -NEED COT APPROVED STAMPED DRAWING FOR ACCESSIBLE ROUTE -ADA ROUTE NEEDS TO ADDRESS W SIDE OF ACCESSIBLE UNITS. NO ACCESSIBLE ROUTE AT S SIDE OF E H/C PARKING AREA-DOES THIS NEED TO BE SIGNED AS SUCH? -H/C ACCESSIBLE UNITS DO NOT HAVE LANDING AT ACCESS POINT ON E SIDE OF BLDG see pics 3502-3509 -COMPLETE ALL SITE WORK, ONCE SITE WORK COMPLETE REMOVE SEDIMENT CONTROLS |
|
| 04/09/2009 | ENGINEERING - FINAL | Not ready for Inspection | NO MORE BUILDING APPROVALS UNTIL H/C PARKING CP ON BOTH E AND NW SIDE OF PROJECT ALL OUTSTANDING ADA ISSUES MUST BE ADDRESSED-INCLUDING A STAMPED/APPROVED PLAN FOR ADA ROUTE |
|
| 03/31/2009 | ENGINEERING - FINAL | Partial Approval | BUILDINGS A, B, I, J, K, L STILL IN ISSUED STATUS ADA ISSUES TO BE ADDRESSED STILL OUTSTANDING |
|
| 02/06/2009 | ENGINEERING - FINAL | Partial Approval | SEE PICS 250581-250582 -UNITS 157/158 ASPHALT NOT COMPLETE SLOPES DO NOT MEET REQMTS HOWEVER CONCERN REGARDING GATE OPENING AND APPLICABLE CLEARANCES SEE FIG 25 ADAAG (4.13) OR ANSI ADAAG 4.8 FOR RAMPS VERIFY SIGNAGE REQMTS FOR SW CORNER OF BLDG NO OTHER CONCERNS FOR OTHER UNITS |