Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/19/2008 | ENGINEERING - FINAL | Approved | THIS IS FOR BLDG H ACCESSIBLE ROUTE IS NOT THROUGH THIS AREA TALKED TO DAVID REGARDING ADA REQUIREMENTS FOR HANDRAIL AT 8% OR STEEPER |