Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/05/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 11/03/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) CONTRACTOR CANCELLED |
|
| 11/02/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE MINIMUM 10 PSI TEST ON UTILITY GAS PIPING FOR FINAL 2) RECEIVED BACTERIA REPORT |
|
| 10/27/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) USE PIPE CLAMPS TO SECURE ON HOSE AS HIGH AS POSSIBLE 2) TIGHTEN SOA DISPENSOR TO PROVIDE A WATER TIGHT CONNECTION 3) ALL GAS PIPING REQUIRES CLEARANCE ABOVE ROOF 4) RE-LOCATE SEDIMENT TRAPS AS NEEDED 5) CORRECT ANY DAMAGED SUPPORTS 6) PROPER SOLVENT WEIDING REQUIRES THE REMOVAL OF PAINT 7) CORRECT AT AAVS BECAUSE THOSE JOINTS CANNOT BE TESTED 8) CORRECT LEAKS |
|
| 10/26/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 04/16/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* NO ADDRESS POSTED! |