Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/14/2008 | ENGINEERING - FINAL | Approved | REQUIRED LETTERS RECIEVED AND FILED | |
| 05/01/2008 | ENGINEERING - FINAL | Partial Approval | Spoke to Randal in regards to engineers cert. for project. Randal to call Fry's to find letter and call me back. | |
| 04/07/2008 | ENGINEERING - FINAL | Partial Approval | OK for temp C of O. Contractor needs to: 1- Provide letter from engineer for site cert. per C.O.T. drainage manaul, Ch.XIV, Sec. 14.2 (7). 2- Stabilize all areas disturbed by construction. 3- Install bike parking. 4- Keep all construction separated from public access. |