Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T07CM03387

Parcel: 12706010A


Addresses:

40 N SWAN RD 01


Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Permit Number - T07CM03387

Inspection Description - ENGINEERING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
07/17/2008 ENGINEERING - FINAL Approved
06/13/2008 ENGINEERING - FINAL Partial Approval Contractor needs to:
1- Complete all work.
2- Clean up all construction debris.
3- Stabilize all areas disturbed by construction.
4- Contractor needs to address truncated domes at Handicap areas.
Spoke to Pat in regards to.
05/02/2008 ENGINEERING - FINAL Partial Approval OK for temp C of O, finish all items per the approved site plan prior to final C of O.
04/03/2008 ENGINEERING - FINAL Partial Approval OK FOR TEMPORARY C OF O EXTENSION FOR (5) BUSINESS DAYS, PENDING SUBMITTAL OF A CONTEMPORARY SITE PLAN.

CONTRACTOR TO MAINTAIN BARRICADING OF AREAS WITH ON-GOING CONSTRUCTION ACTIVITY AND PROVIDE SAFE ACCESS TO THE BUILDING.
04/01/2008 ENGINEERING - FINAL Correction Required ROOF DRAINAGE NEEDS TO BE CONVEYED IN SIDEWALK SCUPPER AT SOUTHWEST CORNER OF BUILDING, AND CONCRETE GRINDING NEEDED ON NORTHWEST CORNER OF BUILDING TO ELIMINATE WATER FLOWING ONTO SIDEWALKS.
03/03/2008 ENGINEERING - FINAL Partial Approval OK FOR TEMPORARY C OF O FOR 1ST FLOOR OF BLDG. ONLY.
1. CONTRACTOR TO MAINTAIN CLEAN, SAFE ACCESS TO BUILDING FOR THE PUBLIC AND OCCUPANTS.
2. CONTRACTOR TO PROVIDE 20' CLEAR DRIVEWAY AROUND BUILDING FRONT AND BACK AT ALL TIMES.
3. PARKING LOT TO BE SWEPT CLEAR OF ALL SOIL AND SEDIMENT.
4. WORK AREAS TO BE BARRICADED TO PREVENT PUBLIC ACCESS.
02/29/2008 ENGINEERING - FINAL Denied NOT READY FOR INSPECTION. SEE PREVIOUS COMMENTS. PARKING LOT STRIPING AND CONFIGURATION IS NOT AN ISSUE FOR TEMP C OF O, HOWEVER SAFE PUBLIC ACCESS AND VEHICLE ACESS MUST BE PROVIDED.
SITE WILL BE RE-INSPECTED AT 7:30 AM 3/3/08.
02/28/2008 ENGINEERING - FINAL Denied NOT READY, SEE PREVIOUS COMMENTS
PROVIDE A REVISED SITE PLAN.
02/11/2008 ENGINEERING - FINAL Correction Required I PHOTOGRAPHED THE SITE FOR A MEETING WITH CRAIG GROSS
02/04/2008 ENGINEERING - FINAL Denied 1. PROVIDE A CONTEMPORARY SITE PLAN THAT SHOWS THE HANDICAP PARKING, HANDICAP RAMPS AND NEW SIDEWALK EAST OF BUILDING.
2. PROVIDE SAFE ACCESS TO BUILDINGS.
3. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS.
4. PROVIDE STORMWATER CONTROLS.
5. TENANT IMPROVEMENT PERMIT DOES NOT PERMIT CONSTRUCTION OUTSIDE THE BUILDING WALLS.