Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/11/2007 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* INSTALL FLOOR CLEANOUT AND BRASS COVER AT TIE IN REDLINE CHANGE AT P-5 LOCATION ON B1 STACK DIAGRAM |
|
| 09/10/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | INSTALL VAC BREAKERS ON TEMP HBS INSTALL HORIZONTAL BRANCH LINES BELOW CONCRETE LEVEL (2 SECTIONS) RETEST OK TO COVER ALL OTHER AREAS BELOW FLOOR |