Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T07CM03382

Parcel: 114600830

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Permit Number - T07CM03382

Inspection Description - ENGINEERING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
03/05/2008 ENGINEERING - FINAL Approved
03/04/2008 ENGINEERING - FINAL Denied COMPLETE SIDEWALK & ASPHALT PATCH
02/08/2008 ENGINEERING - FINAL Partial Approval Temp C of O OK. The following items must be complete prior to final c of O.
1) adjust gas meter at rear of building so that min 36" of clear space for sidewalk.
2) remove temp storage container and all construction debris from rear of building.
Per meeting with Stan Spears an as-built plan of entire site will be submitted by 2/18.
02/04/2008 ENGINEERING - FINAL Denied 1. COMPLETE ALL CONSTRUCTION.
2. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS.
3. PROVIDE C.O.T. APPROVED PLANS WITH ENGINEERING AND ZONING APPROVAL STAMPS.
4. PROVIDE BICYCLE PARKING
5. COMPLETE OUTDOOR DINING AREA CONSTRUCTION.