Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T07CM03382
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/05/2008 | ENGINEERING - FINAL | Approved | ||
03/04/2008 | ENGINEERING - FINAL | Denied | COMPLETE SIDEWALK & ASPHALT PATCH | |
02/08/2008 | ENGINEERING - FINAL | Partial Approval | Temp C of O OK. The following items must be complete prior to final c of O. 1) adjust gas meter at rear of building so that min 36" of clear space for sidewalk. 2) remove temp storage container and all construction debris from rear of building. Per meeting with Stan Spears an as-built plan of entire site will be submitted by 2/18. |
|
02/04/2008 | ENGINEERING - FINAL | Denied | 1. COMPLETE ALL CONSTRUCTION. 2. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS. 3. PROVIDE C.O.T. APPROVED PLANS WITH ENGINEERING AND ZONING APPROVAL STAMPS. 4. PROVIDE BICYCLE PARKING 5. COMPLETE OUTDOOR DINING AREA CONSTRUCTION. |