Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2007 | ENGINEERING - FINAL | Approved | C OF O APPROVED | |
| 11/15/2007 | ENGINEERING - FINAL | Denied | COMPLETE PREVIOUS PUNCH LIST ITEMS 2 & 5 (2) REMOVE EXCESS SOIL AT DRAINAGE CHANNEL INLET AND ON SOUTH SLOPE OF CHANNEL (5) REMOVE ALL CONSTRUCTION DEBRIS FROM TRASH ENCLOSURE AND DRAINAGE CHANNEL. |
|
| 10/25/2007 | ENGINEERING - FINAL | Denied | 1. PROVIDE HANDICAP PARKING SIGN AND STRIPE ACCESS AISLE. 2. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS 3. PAINT VEHICLE DRIVE ARROWS. 4. PATCH ASPHALT PAVEMENT. 5. CLEAN UP DRAINAGEWAY AT NORTH PERIMETER. |