Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 06/23/2009 |
ENGINEERING - FINAL |
|
Approved |
ENGINEERING APPROVAL GIVEN FOR ALL WORK SURROUNDING THE RENOVATION AND ADDITION OF PLATFORM AND RESTROOM ADDITION. ANY WORK DONE OUTSIDE THE SCOPE OF THE PLAZA ON THE S/S OF THE CATHEDRAL SHOULD BE COVERED UNDER A SEPERATE PERMITS. |
| 05/28/2009 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
SITE NOT READY FOR INSPECTION. ONGOING CONSTRUCTION, DEBRIS AND CONSTRUCTION MATERIALS IN SIDEWALK AREAS. SIDEWALK TRANSITIONS NOT FINISHED. COMPLETE ALL SITE WORK PER APPROVED PLAN AND CALL IN FOR REINSPECTION. |