Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* RECEIVED BACTERIA REPORT FOR POTABLE WATER RECEIVED (2) IN HOUSE BACKFLOW CERTIFICATIONS POST A BOND AND GET MECHANICAL INSPECTOR OK FOR GAS CLEARANCE CARD |
|
| 07/10/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE LONG RADIUS DRAINAGE FITTINGS FOR HORIZONTAL CHANGES OF DIRECTION 2. PROVIDE CORRECT DRAINAGE FOR 2 OF 3 COMPARTMENTS OF 3-COMP SINK 3. PROVIDE PROOF OF AIR GAP OR CORRECT BACKFLOW PROTECTION FOR WATER SUPPLY TO COMBY OVEN & PROOFER 4. PROVIDE GRATES AND DOMES FOR ALL FLOOR SINKS 5. PROPERLY SUPPORT GAS PIPING OVERHEAD FOR WATER HEATER 6. COMPLETE ALL PLUMBING INSTALLS 7. EXPOSE LISTING PLATES FOR GAS APPLIANCES 8. COMPLETE INSULATION ON HOT PIPING 9. PROVIDE BACKFLOW CERTIFICATIONS AND BACTERIA REPORT FOR WATER FOR BLD. 10. PROVIDE DRAIN FOR NEW COOLER |