Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T07CM03195
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/23/2008 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
01/22/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* - WATER TEST TO INTERCEPTOR OK - SHALL TEST TO TIE IN INTO SEWER - PROVIDE GREEN TRACER WIRE FOR UNDERGROUND NON-METALLIC PIPING |
|
01/15/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* WATER TEST DWV THRU ROOF OK EXCEPT P-5 IN BAKERY REQUIRES VENT FOR TRAP. P-3 PREP SINKS ARE TO BE INDIRECTLY DRAINED TO APPROVED RECEPTOR IN KITCHEN AREA. SHALL SEE CONTINUATION OF 4" FROM INTERIOR TO INTERCEPTOR & BUILDING SEWER |
|
01/14/2008 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELLED |
|
11/07/2007 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. SEE CHAPTER 10 SECTION 1014.2 FOR CORRECT INSTALLATION OF HYDROMECHANICAL INTERCEPTORS 2. YOUR ISOMETRIC PLAN SHOWS FIXTURES WITH NO VENTS, 2006 UPC REQUIREMENTS ARE FOR ALL TRAPS TO BE VENTED 3. CHANGES FROM APPROVED REQUIRE MINIMUM REDLINES ON SITE AT TIME OF INSPECTION. |