Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/04/2007 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* REDLINE ISOMETRIC REFLECTIVE OF INSTALLATION NO REVISION REQ'D OK TO COVER DON'T FORGET PIPE WRAPS |
|
| 09/30/2007 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* INKED IN CHANGES DO NOT AN APPROVED PLAN MAKE - REDLINE CHANGES ARE DONE IN THE FIELD AND ARE TO BE IN RED INK - INKED IN CHANGES MADE BY THE PLAN REVIEWER ARE OK ALL OTHER CHANGES ARE TO GO THROUGH PROPER CHANNELS - NOT INSTALLED PER INKED IN CHANGES WET SOILS INDICATE A LEAK |
|
| 09/26/2007 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1. PLAN INCOMPLETE: NO MATERIAL TYPES LISTED FOR INSTALLATION 2. A SANTEE MAY NOT BE LAID ON ITS BACK FOR DWV WASTE PIPING (EVEN FOR TEST PURPOSES) - TEST PIPING ALL THE WAY TO THE P.O.C 3. NOT INSTALLED PER PLAN - NO REDLINES ON SITE |