Inspection History Details
Inspection Status: Partial Approval
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/19/2008 | ENGINEERING - FINAL | Partial Approval | PLZ RECALL AT BLDG FINAL -PORTA TOILETS, DUMPSTER AND FENCING TO BE REMOVED BEFORE APPROVAL |
|
| 05/19/2008 | ENGINEERING - FINAL | Approved | AP | |
| 05/07/2008 | ENGINEERING - FINAL | Partial Approval | -ALL OVERHEAD WORK IN DRIVE THRU COMPLETE ON EXTERIOR OF BLDG -ALL CONST FENCING PREVENTING TRAFFIC FROM ENTERING ANY AREA OTHER THAN DRIVE THRU IN PLACE |
|
| 05/06/2008 | ENGINEERING - FINAL | Not ready for Inspection | SITE NOT READY FOR DRIVE THRU TO BE OPEN | |
| 05/05/2008 | ENGINEERING - FINAL | Not ready for Inspection | Site not ready, contractor needs to install temp fence and dumpster gates prio to temp C of O. call for reinspection |