Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/09/2007 | ENGINEERING - FINAL | Approved | Contractor completed punch list | |
| 11/08/2007 | ENGINEERING - FINAL | Denied | Contractor needs to: 1- Separate all construction activity from public access. 2- Have dumpster removed. 3- Complete all construction. 4- Repair backfill over gas line. |